X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114102006002

Well Details

Well ID: 0114102006002
Loading map...
Location: 00/06-20-011-10W4/2
Location Alias: 00/06-20-11-10 W4M
Location Alias 2: 00/06-20-011-10 W4/02
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 10
Section: 20
County/Municipality: County of Forty Mile No. 8
Well Name: SOC BI 6-20-11-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0029199
License Date: 1965-10-21
License Status: Suspension
Spud Date: 1965-11-09
Final Drill Date: 1965-11-12
Well Total Depth: 688.20 m
Surface Hole Latitude: 49.922295
Surface Hole Longitude: -111.337964

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-10-21 Obtained License
1965-11-12 Drill Stem Test Performed
1965-11-12 Finished Drilling
1965-11-12 Well Mode changed to Drilled and Cased
1965-11-13 Drill Stem Test Performed
1965-11-14 Production Casing Operation Performed
1965-12-02 Perforation Treatment Performed - Jet Perforation
1965-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-05 Perforation Treatment Performed - Fractured
1965-12-05 Perforation Treatment Performed - Jet Perforation
1965-12-05 Perforation Treatment Performed - Nitrogen Treatment
2000-04-11 Well Log Performed
2001-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-18 Plug Back Performed
2001-02-21 Perforation Treatment Performed - Jet Perforation
2001-02-22 Perforation Treatment Performed - Fractured
2001-05-17 Well Began Production
2001-05-17 Well Fluid changed to Gas
2001-05-17 Well Mode changed to Flowing
2007-04-30 Well Fluid changed to Gas
2007-04-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-12-02 Perforation 657.10 659.00 13
1965-12-05 Perforation 659.90 660.50 13
1965-12-05 Nitrogen Treatment 657.10 660.50 0
1965-12-05 Acid Treatment 657.10 660.50 0
1965-12-05 Fracture 657.10 660.50 0
2001-02-18 Packing Device Capped w/Cement 636.50 644.50 0
2001-02-21 Perforation 542.50 544.40 14
2001-02-22 Fracture 542.50 544.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 5373 0.0 0.0 0.0
2002 6499 0.0 0.0 0.0
2003 8346 0.0 0.0 0.0
2004 8492 0.0 0.0 0.0
2005 8623 0.0 0.0 0.0
2006 8688 0.0 0.0 0.0
2007 2868 0.0 0.0 0.0

For data sources see[5]

References