X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114102907000

Well Details

Well ID: 0114102907000
Loading map...
Location: 00/07-29-011-10W4/0
Location Alias: 00/07-29-11-10 W4M
Location Alias 2: 00/07-29-011-10 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 10
Section: 29
County/Municipality: County of Forty Mile No. 8
Well Name: SOC BI 7-29-11-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0030993
License Date: 1966-09-15
License Status: Issued
Spud Date: 1966-09-20
Final Drill Date: 1966-09-22
Well Total Depth: 702.30 m
Surface Hole Latitude: 49.936961
Surface Hole Longitude: -111.331498

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-09-15 Obtained License
1966-09-22 Finished Drilling
1966-09-22 Well Mode changed to Drilled and Cased
1966-09-23 Drill Stem Test Performed
1966-09-25 Production Casing Operation Performed
1966-10-20 Perforation Treatment Performed - Jet Perforation
1966-12-28 Well Began Production
1966-12-28 Well Fluid changed to Gas
1966-12-28 Well Mode changed to Flowing
1981-05-19 Well Fluid changed to Gas
1981-05-19 Well Mode changed to Suspended
2000-02-22 Well Log Performed
2000-02-23 Well Log Performed
2001-02-19 Well Log Performed
2001-02-22 Perforation Treatment Performed - Jet Perforation
2001-02-22 Well Fluid changed to Gas
2001-02-22 Well Log Performed
2001-02-22 Well Mode changed to Suspended
2001-03-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-31 Perforation Treatment Performed - Jet Perforation
2001-03-31 Plug Back Performed
2001-03-31 Well Fluid changed to Gas
2001-03-31 Well Log Performed
2001-03-31 Well Mode changed to Abandoned Zone
2001-04-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-20 Perforation 669.30 670.60 7
1966-10-20 Perforation 671.50 672.70 7
2001-02-22 Perforation 663.00 665.10 14
2001-03-31 Packing Device Capped w/Cement 641.00 649.00 0
2001-03-31 Perforation 553.50 557.20 13
2001-04-21 Fracture 553.50 557.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 6047 0.0 0.0 0.0
1972 8783 0.0 0.0 0.0
1973 8471 0.0 0.0 0.0
1974 8711 0.0 0.0 0.0
1975 8711 0.0 0.0 0.0
1976 8779 0.0 0.0 0.0
1977 8579 0.0 0.0 0.0
1978 8498 0.0 0.0 0.0
1979 8181 0.0 0.0 0.0
1980 8256 0.0 0.0 0.0
1981 3218 0.0 0.0 0.0

For data sources see[5]

References