If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0114141314000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.914884,"lon":-111.792141,"icon":""}]} |
| Location: 00/14-13-011-14W4/0 | |
| Location Alias: 00/14-13-11-14 W4M | |
| Location Alias 2: 00/14-13-011-14 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 011 | |
| Meridian: 4 | |
| Range: 14 | |
| Section: 13 | |
| County/Municipality: Municipal District of Taber | |
| Well Name: CDN RES ET AL GRDFKS 14-13-11-14 | |
| Operator Name: Canadian Reserve Oil And Gas Ltd. | |
| License Number: 0054222 | |
| License Date: 1975-07-15 | |
| License Status: RecCertified | |
| Spud Date: 1975-07-25 | |
| Final Drill Date: 1975-07-30 | |
| Well Total Depth: 905.30 m | |
| Surface Hole Latitude: 49.914884 | |
| Surface Hole Longitude: -111.792141 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1975-07-15 | Obtained License |
| 1975-07-30 | Drill Stem Test Performed |
| 1975-07-30 | Finished Drilling |
| 1975-07-30 | Well Mode changed to Drilled and Cased |
| 1975-07-31 | Production Casing Operation Performed |
| 1975-08-13 | Perforation Treatment Performed - Jet Perforation |
| 1975-08-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1975-08-19 | Well Began Production |
| 1975-08-19 | Well Fluid changed to Crude Oil |
| 1975-08-19 | Well Mode changed to Pumping |
| 1975-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1975-11-05 | Perforation Treatment Performed - Cement Squeeze |
| 1975-11-08 | Perforation Treatment Performed - Jet Perforation |
| 1975-11-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-11-18 | Well Fluid changed to Crude Oil |
| 1976-11-18 | Well Mode changed to Suspended |
| 1982-06-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1982-06-05 | Well Abandoned |
| 1982-06-05 | Well Fluid changed to Crude Oil |
| 1982-06-05 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1975-08-13 | Perforation | 869.90 | 870.80 | 7 |
| 1975-08-13 | Perforation | 872.30 | 875.40 | 7 |
| 1975-08-14 | Acid Treatment | 869.90 | 875.40 | 0 |
| 1975-10-23 | Acid Treatment | 869.90 | 875.40 | 0 |
| 1975-11-05 | Cement Squeeze | 869.90 | 875.40 | 0 |
| 1975-11-08 | Perforation | 872.30 | 873.60 | 7 |
| 1975-11-09 | Acid Treatment | 873.60 | 873.60 | 0 |
| 1982-06-05 | Packing Device Capped w/Cement | 860.70 | 868.70 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1975 | 1619 | 0.0 | 0.0 | 0.0 |
For data sources see[5]