X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114142606000

Well Details

Well ID: 0114142606000
Loading map...
Location: 00/06-26-011-14W4/0
Location Alias: 00/06-26-11-14 W4M
Location Alias 2: 00/06-26-011-14 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 14
Section: 26
County/Municipality: Municipal District of Taber
Well Name: DECL GRDFKS 6-26-11-14
Operator Name: New North Resources Ltd.
License Number: 0136835
License Date: 1988-10-11
License Status: Issued
Spud Date: 1988-10-21
Final Drill Date: 1988-10-26
Well Total Depth: 958.00 m
Surface Hole Latitude: 49.935679
Surface Hole Longitude: -111.813298

For data sources see[1][2]

Well History

Date Event
1988-10-11 Obtained License
1988-10-22 Surface Casing Operation Performed
1988-10-24 Well Log Performed
1988-10-25 Drill Stem Test Performed
1988-10-26 Finished Drilling
1988-10-26 Well Mode changed to Drilled and Cased
1988-10-27 Production Casing Operation Performed
1988-10-27 Rig Released
1988-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-06 Perforation Treatment Performed - Jet Perforation
1988-11-06 Well Log Performed
1988-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-11-07 Perforation Treatment Performed - Jet Perforation
1988-11-07 Plug Back Performed
1988-11-10 Well Began Production
1988-11-10 Well Fluid changed to Crude Oil
1988-11-10 Well Mode changed to Pumping
1995-05-04 Well Fluid changed to Crude Oil
1995-05-04 Well Mode changed to Suspended
2007-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-05-14 Well Fluid changed to Crude Oil
2007-05-14 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-11-06 Perforation 942.50 943.50 13
1988-11-06 Acid Treatment 942.50 943.50 0
1988-11-07 Packing Device Capped w/Cement 937.50 940.50 0
1988-11-07 Perforation 921.00 922.00 13
2007-05-03 Acid Treatment 921.00 922.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1176 0.0 0.0 0.0
1989 7909 0.0 0.0 0.0
1990 7878 0.0 0.0 0.0
1991 8638 0.0 0.0 0.0
1992 6919 0.0 0.0 0.0
1993 7808 0.0 0.0 0.0
1994 8181 0.0 0.0 0.0
1995 2891 0.0 0.0 0.0
2007 4719 0.0 0.0 0.0
2008 8658 0.0 0.0 0.0
2009 8645 0.0 0.0 0.0
2010 8518 0.0 0.0 0.0
2011 8600 0.0 0.0 0.0
2012 8774 0.0 0.0 0.0
2013 8517 0.0 0.0 0.0
2014 8004 0.0 0.0 0.0
2015 7825 0.0 0.0 0.0
2016 4819 0.0 0.0 0.0
2017 5162 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 8448 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[5]

References