If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114142606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.935679,"lon":-111.813298,"icon":""}]} |
Location: 00/06-26-011-14W4/0 | |
Location Alias: 00/06-26-11-14 W4M | |
Location Alias 2: 00/06-26-011-14 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 14 | |
Section: 26 | |
County/Municipality: Municipal District of Taber | |
Well Name: DECL GRDFKS 6-26-11-14 | |
Operator Name: New North Resources Ltd. | |
License Number: 0136835 | |
License Date: 1988-10-11 | |
License Status: Issued | |
Spud Date: 1988-10-21 | |
Final Drill Date: 1988-10-26 | |
Well Total Depth: 958.00 m | |
Surface Hole Latitude: 49.935679 | |
Surface Hole Longitude: -111.813298 |
Date | Event |
---|---|
1988-10-11 | Obtained License |
1988-10-22 | Surface Casing Operation Performed |
1988-10-24 | Well Log Performed |
1988-10-25 | Drill Stem Test Performed |
1988-10-26 | Finished Drilling |
1988-10-26 | Well Mode changed to Drilled and Cased |
1988-10-27 | Production Casing Operation Performed |
1988-10-27 | Rig Released |
1988-11-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-11-06 | Perforation Treatment Performed - Jet Perforation |
1988-11-06 | Well Log Performed |
1988-11-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-11-07 | Perforation Treatment Performed - Jet Perforation |
1988-11-07 | Plug Back Performed |
1988-11-10 | Well Began Production |
1988-11-10 | Well Fluid changed to Crude Oil |
1988-11-10 | Well Mode changed to Pumping |
1995-05-04 | Well Fluid changed to Crude Oil |
1995-05-04 | Well Mode changed to Suspended |
2007-05-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-05-14 | Well Fluid changed to Crude Oil |
2007-05-14 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-11-06 | Perforation | 942.50 | 943.50 | 13 |
1988-11-06 | Acid Treatment | 942.50 | 943.50 | 0 |
1988-11-07 | Packing Device Capped w/Cement | 937.50 | 940.50 | 0 |
1988-11-07 | Perforation | 921.00 | 922.00 | 13 |
2007-05-03 | Acid Treatment | 921.00 | 922.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 1176 | 0.0 | 0.0 | 0.0 |
1989 | 7909 | 0.0 | 0.0 | 0.0 |
1990 | 7878 | 0.0 | 0.0 | 0.0 |
1991 | 8638 | 0.0 | 0.0 | 0.0 |
1992 | 6919 | 0.0 | 0.0 | 0.0 |
1993 | 7808 | 0.0 | 0.0 | 0.0 |
1994 | 8181 | 0.0 | 0.0 | 0.0 |
1995 | 2891 | 0.0 | 0.0 | 0.0 |
2007 | 4719 | 0.0 | 0.0 | 0.0 |
2008 | 8658 | 0.0 | 0.0 | 0.0 |
2009 | 8645 | 0.0 | 0.0 | 0.0 |
2010 | 8518 | 0.0 | 0.0 | 0.0 |
2011 | 8600 | 0.0 | 0.0 | 0.0 |
2012 | 8774 | 0.0 | 0.0 | 0.0 |
2013 | 8517 | 0.0 | 0.0 | 0.0 |
2014 | 8004 | 0.0 | 0.0 | 0.0 |
2015 | 7825 | 0.0 | 0.0 | 0.0 |
2016 | 4819 | 0.0 | 0.0 | 0.0 |
2017 | 5162 | 0.0 | 0.0 | 0.0 |
2018 | 8735 | 0.0 | 0.0 | 0.0 |
2019 | 8448 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[5]