X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0114182015000

Well Details

Well ID: 0114182015000
Loading map...
Location: 00/15-20-011-18W4/0
Location Alias: 00/15-20-11-18 W4M
Location Alias 2: 00/15-20-011-18 W4/00
Country: Canada
Province: Alberta
Township: 011
Meridian: 4
Range: 18
Section: 20
County/Municipality: Municipal District of Taber
Well Name: SOC RETLAW 15-20-11-18
Operator Name: AlphaBow Energy Ltd.
License Number: 0200791
License Date: 1997-04-30
License Status: Abandoned
Spud Date: 1997-05-09
Final Drill Date: 1997-05-13
Well Total Depth: 1190.00 m
Surface Hole Latitude: 49.929118
Surface Hole Longitude: -112.425495

For data sources see[1][2]

Well History

Date Event
1997-04-30 Obtained License
1997-05-10 Surface Casing Operation Performed
1997-05-13 Finished Drilling
1997-05-13 Well Log Performed
1997-05-13 Well Mode changed to Drilled and Cased
1997-05-14 Drill Stem Test Performed
1997-05-14 Well Log Performed
1997-05-15 Drill Stem Test Performed
1997-05-16 Production Casing Operation Performed
1997-05-16 Rig Released
1997-06-16 Perforation Treatment Performed - Jet Perforation
1997-06-16 Well Log Performed
1997-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-18 Well Began Production
1998-09-18 Well Fluid changed to Gas
1998-09-18 Well Mode changed to Flowing
1998-12-15 Well Log Performed
1999-03-12 Well Log Performed
1999-03-13 Well Log Performed
1999-03-17 Well Log Performed
1999-11-01 Well Fluid changed to Gas
1999-11-01 Well Mode changed to Suspended
2007-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-19 Plug Back Performed
2007-01-19 Well Fluid changed to Gas
2007-01-19 Well Mode changed to Abandoned Zone
2007-02-25 Well Abandoned
2007-02-25 Well Fluid changed to Gas
2007-02-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-06-16 Perforation 1132.00 1135.00 18
1997-06-16 Perforation 1138.00 1141.00 18
1997-06-19 Acid Treatment 1132.00 1141.00 0
2007-01-19 Packing Device Capped w/Cement 1118.50 1126.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2928 0.0 0.0 0.0
1999 2160 0.0 0.0 0.0

For data sources see[5]

References