If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114271314002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.913711,"lon":-113.577792,"icon":""}]} |
Location: 00/14-13-011-27W4/2 | |
Location Alias: 00/14-13-11-27 W4M | |
Location Alias 2: 00/14-13-011-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 27 | |
Section: 13 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: LTAM EASTM 14-13-11-27 | |
Operator Name: Long Term Asset Management Inc. | |
License Number: 0337575 | |
License Date: 2005-09-01 | |
License Status: Abandoned | |
Spud Date: 2005-09-22 | |
Final Drill Date: 2005-10-03 | |
Well Total Depth: 2515.00 m | |
Surface Hole Latitude: 49.913711 | |
Surface Hole Longitude: -113.577792 |
Date | Event |
---|---|
2005-09-01 | Obtained License |
2005-09-22 | Direction Drilling Operation Performed - Deviate |
2005-09-23 | Surface Casing Operation Performed |
2005-10-03 | Finished Drilling |
2005-10-03 | Well Mode changed to Drilled and Cased |
2005-10-04 | Well Log Performed |
2005-10-05 | Production Casing Operation Performed |
2005-10-06 | Rig Released |
2005-10-26 | Perforation Treatment Performed - Jet Perforation |
2005-10-26 | Well Log Performed |
2005-10-27 | Perforation Treatment Performed - Fractured |
2006-10-03 | Well Log Performed |
2009-03-03 | Well Log Performed |
2009-03-04 | Perforation Treatment Performed - Jet Perforation |
2009-03-06 | Perforation Treatment Performed - Jet Perforation |
2009-03-06 | Well Log Performed |
2009-03-07 | Perforation Treatment Performed - Fractured |
2009-06-18 | Well Began Production |
2009-06-18 | Well Fluid changed to Gas |
2009-06-18 | Well Mode changed to Pumping |
2010-10-26 | Well Log Performed |
2010-10-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-28 | Plug Back Performed |
2010-10-28 | Well Log Performed |
2010-10-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-29 | Plug Back Performed |
2010-10-29 | Well Fluid changed to Gas |
2010-10-29 | Well Log Performed |
2010-10-29 | Well Mode changed to Abandoned Zone |
2010-10-30 | Perforation Treatment Performed - Jet Perforation |
2010-10-30 | Well Log Performed |
2010-10-31 | Perforation Treatment Performed - Remedial Casing |
2010-11-01 | Perforation Treatment Performed - Jet Perforation |
2010-11-01 | Well Log Performed |
2010-11-02 | Perforation Treatment Performed - Remedial Casing |
2010-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-11-03 | Perforation Treatment Performed - Jet Perforation |
2010-11-03 | Well Log Performed |
2010-12-01 | Well Abandoned |
2010-12-01 | Well Fluid changed to Gas |
2010-12-01 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-09-22 | 1.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-10-26 | Perforation | 2474.00 | 2479.00 | 20 |
2010-10-31 | Remedial Casing Cementing | 1079.00 | 1080.00 | 0 |
2010-11-01 | Perforation | 541.00 | 542.00 | 17 |
2010-11-02 | Remedial Casing Cementing | 541.00 | 542.00 | 0 |
2010-11-03 | Perforation | 450.00 | 451.00 | 17 |
2010-11-03 | Packing Device Capped w/Cement | 438.00 | 446.00 | 0 |
2005-10-27 | Fracture | 2474.00 | 2479.00 | 0 |
2009-03-04 | Perforation | 2167.60 | 2170.00 | 17 |
2009-03-06 | Perforation | 2118.00 | 2121.00 | 17 |
2009-03-07 | Fracture | 2118.00 | 2170.00 | 0 |
2010-10-28 | Packing Device Capped w/Cement | 2366.50 | 2374.50 | 0 |
2010-10-29 | Packing Device Capped w/Cement | 2104.00 | 2112.00 | 0 |
2010-10-29 | Packing Device Capped w/Cement | 2149.00 | 2157.00 | 0 |
2010-10-30 | Perforation | 1079.00 | 1080.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 1345 | 0.0 | 0.0 | 0.0 |
For data sources see[6]