If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114272312000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.925546,"lon":-113.590285,"icon":""}]} |
Location: 00/12-23-011-27W4/0 | |
Location Alias: 00/12-23-11-27 W4M | |
Location Alias 2: 00/12-23-011-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 27 | |
Section: 23 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: LTAM EASTM 12-23-11-27 | |
Operator Name: Long Term Asset Management Inc. | |
License Number: 0327761 | |
License Date: 2005-03-08 | |
License Status: Issued | |
Spud Date: 2006-01-18 | |
Final Drill Date: 2006-01-23 | |
Well Total Depth: 2883.00 m | |
Surface Hole Latitude: 49.925546 | |
Surface Hole Longitude: -113.590285 |
Date | Event |
---|---|
2005-03-08 | Obtained License |
2006-01-19 | Surface Casing Operation Performed |
2006-01-23 | Finished Drilling |
2006-01-23 | Well Mode changed to Drilled and Cased |
2006-01-25 | Well Log Performed |
2006-01-26 | Production Casing Operation Performed |
2006-01-27 | Rig Released |
2006-06-13 | Liner Casing Operation Performed |
2006-06-18 | Well Log Performed |
2006-06-19 | Well Log Performed |
2006-06-20 | Perforation Treatment Performed - Jet Perforation |
2006-06-22 | Perforation Treatment Performed - Fractured |
2006-07-07 | Well Began Production |
2006-07-07 | Well Fluid changed to Gas |
2006-07-07 | Well Mode changed to Flowing |
2007-03-09 | Well Log Performed |
2007-03-10 | Perforation Treatment Performed - Jet Perforation |
2007-03-13 | Perforation Treatment Performed - Fractured |
2007-03-17 | Well Fluid changed to Gas |
2007-03-17 | Well Mode changed to Flowing |
2009-04-01 | Well Fluid changed to Gas |
2009-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-06-20 | Perforation | 2356.00 | 2359.00 | 20 |
2006-06-22 | Fracture | 2356.00 | 2359.00 | 0 |
2007-03-10 | Perforation | 2332.00 | 2334.50 | 20 |
2007-03-13 | Fracture | 2332.00 | 2334.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 4252 | 0.0 | 0.0 | 0.0 |
2007 | 8549 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8718 | 0.0 | 0.0 | 0.0 |
2010 | 8393 | 0.0 | 0.0 | 0.0 |
2011 | 8703 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8506 | 0.0 | 0.0 | 0.0 |
2014 | 8639 | 0.0 | 0.0 | 0.0 |
2015 | 8554 | 0.0 | 0.0 | 0.0 |
2016 | 8539 | 0.0 | 0.0 | 0.0 |
2017 | 8633 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8599 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]