If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0114280116000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.887498,"lon":-113.691034,"icon":""}]} |
Location: 00/16-01-011-28W4/0 | |
Location Alias: 00/16-01-11-28 W4M | |
Location Alias 2: 00/16-01-011-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 011 | |
Meridian: 4 | |
Range: 28 | |
Section: 01 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: DOME AMOCO CLARESHOLM 16-1-11-28 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0078447 | |
License Date: 1979-10-04 | |
License Status: RecCertified | |
Spud Date: 1979-10-09 | |
Final Drill Date: 1979-11-28 | |
Well Total Depth: 2824.00 m | |
Surface Hole Latitude: 49.887498 | |
Surface Hole Longitude: -113.691034 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-10-04 | Obtained License |
1979-10-24 | Lost Circulation Occurred |
1979-10-31 | Lost Circulation Occurred |
1979-11-12 | Drill Stem Test Performed |
1979-11-28 | Finished Drilling |
1979-12-01 | Drill Stem Test Performed |
1979-12-04 | Production Casing Operation Performed |
1979-12-18 | Perforation Treatment Performed - Jet Perforation |
1979-12-19 | Perforation Treatment Performed - Jet Perforation |
1979-12-21 | Perforation Treatment Performed - Fractured |
1980-01-11 | Perforation Treatment Performed - Jet Perforation |
1980-01-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-01-18 | Perforation Treatment Performed - Jet Perforation |
1980-01-19 | Perforation Treatment Performed - Jet Perforation |
1980-02-08 | Perforation Treatment Performed - Fractured |
1980-02-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-02-18 | Well Abandoned |
1980-02-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-12-18 | Perforation | 2694.50 | 2697.00 | 13 |
1980-02-18 | Packing Device Capped w/Cement | 2271.50 | 2280.00 | 0 |
1979-12-19 | Perforation | 2666.00 | 2670.00 | 13 |
1979-12-21 | Fracture | 2666.00 | 2670.00 | 0 |
1980-01-11 | Perforation | 2464.00 | 2470.00 | 13 |
1980-01-17 | Packing Device Capped w/Cement | 2677.00 | 2685.00 | 0 |
1980-01-17 | Packing Device Capped w/Cement | 2651.00 | 2660.00 | 0 |
1980-01-18 | Perforation | 2287.50 | 2293.50 | 7 |
1980-01-19 | Perforation | 2285.50 | 2287.50 | 7 |
1980-02-08 | Fracture | 2285.50 | 2293.50 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1979-10-24 | Lost Circulation | 1854.00 | 1882.00 |
1979-10-31 | Lost Circulation | 2205.00 | 2205.00 |
For data sources see[5]