If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0124013110000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.042793,"lon":-110.127329,"icon":""}]} |
| Location: 00/10-31-012-01W4/0 | |
| Location Alias: 00/10-31-12-01 W4M | |
| Location Alias 2: 00/10-31-012-01 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 012 | |
| Meridian: 4 | |
| Range: 01 | |
| Section: 31 | |
| County/Municipality: Cypress County | |
| Well Name: MAYNARD MEDHAT 10-31-12-1 | |
| Operator Name: Maynard Energy Inc. | |
| License Number: 0017790 | |
| License Date: 1959-09-21 | |
| License Status: RecCertified | |
| Spud Date: 1959-10-23 | |
| Final Drill Date: 1959-11-07 | |
| Well Total Depth: 471.50 m | |
| Surface Hole Latitude: 50.042793 | |
| Surface Hole Longitude: -110.127329 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1959-09-21 | Obtained License |
| 1959-10-25 | Liner Casing Operation Performed |
| 1959-11-07 | Finished Drilling |
| 1959-11-07 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1959-11-07 | Perforation Treatment Performed - Open-Hole Completion |
| 1959-11-07 | Well Mode changed to Drilled and Cased |
| 1960-06-22 | Perforation Treatment Performed - Bullet Perforation |
| 1960-06-24 | Perforation Treatment Performed - Fractured |
| 1976-10-15 | Well Fluid changed to Gas |
| 1976-10-15 | Well Mode changed to Testing |
| 1976-10-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1976-10-16 | Well Abandoned |
| 1976-10-16 | Well Fluid changed to Gas |
| 1976-10-16 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1959-11-07 | Open Hole/Barefoot Completion | 453.80 | 465.40 | 0 |
| 1959-11-07 | Acid Wash | 453.80 | 465.40 | 0 |
| 1960-06-22 | Bullet Perforation | 461.50 | 468.20 | 13 |
| 1960-06-24 | Fracture | 461.50 | 468.20 | 0 |
| 1976-10-16 | Packing Device Capped w/Cement | 423.70 | 423.70 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]