If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124053311032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.04873,"lon":-110.634606,"icon":""}]} |
Location: 03/11-33-012-05W4/2 | |
Location Alias: 03/11-33-12-05 W4M | |
Location Alias 2: 03/11-33-012-05 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 05 | |
Section: 33 | |
County/Municipality: Cypress County | |
Well Name: ENERMARK 03 HZ MEDHAT 11-33-12-5 | |
Operator Name: Enerplus Corporation | |
License Number: 0199385 | |
License Date: 1997-03-14 | |
License Status: Issued | |
Spud Date: 1997-07-07 | |
Final Drill Date: 1997-07-14 | |
Well Total Depth: 1447.00 m | |
Surface Hole Latitude: 50.048730 | |
Surface Hole Longitude: -110.634606 |
Date | Event |
---|---|
1997-03-14 | Obtained License |
1997-07-08 | Surface Casing Operation Performed |
1997-07-09 | Direction Drilling Operation Performed - Horizontal |
1997-07-11 | Intermediate Casing Operation Performed |
1997-07-13 | Direction Drilling Operation Performed - Horizontal |
1997-07-14 | Finished Drilling |
1997-07-15 | Liner Casing Operation Performed |
1997-07-15 | Perforation Treatment Performed - Open-Hole Completion |
1997-07-15 | Perforation Treatment Performed - Slotted Liner or Casing |
1997-07-15 | Well Log Performed |
1997-07-16 | Rig Released |
1997-07-16 | Well Structure changed to Drain |
2007-04-29 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2007-04-30 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-07-09 | 525.00 | Horizontal |
1997-07-13 | 1330.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-07-15 | Slotted Liner | 959.00 | 1387.00 | 0 |
1997-07-15 | Open Hole/Barefoot Completion | 1387.00 | 1447.00 | 0 |
2007-04-29 | Hydra Jet Perforation | 163.00 | 167.00 | 1 |
2007-04-30 | Remedial Casing Cementing | 163.00 | 167.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-05-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]