Well ID: 0124053315030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.044492,"lon":-110.616429,"icon":""}]} |
Location: 03/15-33-012-05W4/0 | |
Location Alias: 03/15-33-12-05 W4M | |
Location Alias 2: 03/15-33-012-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 05 | |
Section: 33 | |
County/Municipality: Cypress County | |
Well Name: ENERPLUS CORP 103 MEDHAT 15-33-12-5 | |
Operator Name: Enerplus Corporation | |
License Number: 0445534 | |
License Date: 2012-04-27 | |
License Status: Issued | |
Spud Date: 2012-06-25 | |
Final Drill Date: 2012-06-30 | |
Well Total Depth: 1700.00 m | |
Surface Hole Latitude: 50.044492 | |
Surface Hole Longitude: -110.616429 |
Date | Event |
---|---|
2012-04-27 | Obtained License |
2012-06-25 | Surface Casing Operation Performed |
2012-06-26 | Well Log Performed |
2012-06-27 | Direction Drilling Operation Performed - Deviate |
2012-06-27 | Direction Drilling Operation Performed - Horizontal |
2012-06-28 | Intermediate Casing Operation Performed |
2012-06-30 | Finished Drilling |
2012-06-30 | Well Mode changed to Drilled and Cased |
2012-07-01 | Liner Casing Operation Performed |
2012-07-01 | Perforation Treatment Performed - Slotted Liner or Casing |
2012-07-02 | Rig Released |
2012-07-12 | Well Log Performed |
2012-11-20 | Well Began Production |
2012-11-20 | Well Fluid changed to Crude Oil |
2012-11-20 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-06-25 | Quintera Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-06-27 | 645.30 | Deviate (5 - 79 degrees) |
2012-06-27 | 967.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-01 | Slotted Liner | 1000.00 | 1700.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 929 | 0.0 | 0.0 | 0.0 |
2013 | 8631 | 0.0 | 0.0 | 0.0 |
2014 | 8500 | 0.0 | 0.0 | 0.0 |
2015 | 8464 | 0.0 | 0.0 | 0.0 |
2016 | 8371 | 0.0 | 0.0 | 0.0 |
2017 | 8488 | 0.0 | 0.0 | 0.0 |
2018 | 8311 | 0.0 | 0.0 | 0.0 |
2019 | 8429 | 0.0 | 0.0 | 0.0 |
2020 | 2105 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-02 | No Incident Encountered | 0.00 | 0.00 |
2012-07-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]