If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124072810002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.029425,"lon":-110.897969,"icon":""}]} |
Location: 00/10-28-012-07W4/2 | |
Location Alias: 00/10-28-12-07 W4M | |
Location Alias 2: 00/10-28-012-07 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 07 | |
Section: 28 | |
County/Municipality: Cypress County | |
Well Name: CITY OF MEDICINE HAT 10-28-12-7 | |
Operator Name: City Of Medicine Hat | |
License Number: 0059131 | |
License Date: 1976-07-13 | |
License Status: Issued | |
Spud Date: 1976-08-18 | |
Final Drill Date: 1976-08-20 | |
Well Total Depth: 621.80 m | |
Surface Hole Latitude: 50.029425 | |
Surface Hole Longitude: -110.897969 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-07-13 | Obtained License |
1976-08-20 | Finished Drilling |
1976-08-20 | Production Casing Operation Performed |
1976-08-20 | Well Mode changed to Drilled and Cased |
1976-09-04 | Perforation Treatment Performed - Bullet Perforation |
1976-09-04 | Perforation Treatment Performed - Selective Bullet Perforations |
1976-09-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-09-15 | Perforation Treatment Performed - Fractured |
1976-09-20 | Perforation Treatment Performed - Bullet Perforation |
1976-09-20 | Perforation Treatment Performed - Selective Bullet Perforations |
1976-09-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-09-29 | Perforation Treatment Performed - Fractured |
1976-10-09 | Perforation Treatment Performed - Bullet Perforation |
1976-10-09 | Perforation Treatment Performed - Selective Bullet Perforations |
1976-10-14 | Perforation Treatment Performed - Fractured |
1976-10-27 | Perforation Treatment Performed - Bullet Perforation |
1976-10-27 | Perforation Treatment Performed - Selective Bullet Perforations |
1976-11-06 | Perforation Treatment Performed - Fractured |
1977-01-04 | Well Began Production |
1977-01-04 | Well Fluid changed to Gas |
1977-01-04 | Well Mode changed to Flowing |
1987-12-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-09-04 | Selective Bullet Perforations | 576.10 | 576.70 | 0 |
1976-09-14 | Acid Treatment | 576.10 | 613.00 | 0 |
1976-09-15 | Fracture | 576.10 | 613.00 | 0 |
1976-09-20 | Bullet Perforation | 447.10 | 452.30 | 3 |
1976-09-20 | Selective Bullet Perforations | 454.80 | 455.40 | 0 |
1976-09-20 | Selective Bullet Perforations | 456.00 | 465.70 | 0 |
1976-09-20 | Selective Bullet Perforations | 467.00 | 478.50 | 0 |
1976-09-20 | Selective Bullet Perforations | 479.10 | 479.80 | 0 |
1976-09-20 | Selective Bullet Perforations | 494.40 | 495.00 | 0 |
1976-09-28 | Acid Treatment | 447.10 | 495.00 | 0 |
1976-09-29 | Fracture | 447.10 | 495.00 | 0 |
1976-09-04 | Bullet Perforation | 578.20 | 579.10 | 3 |
1976-10-09 | Bullet Perforation | 400.50 | 402.90 | 3 |
1976-10-09 | Selective Bullet Perforations | 404.80 | 405.40 | 0 |
1976-10-09 | Selective Bullet Perforations | 406.00 | 406.30 | 0 |
1976-10-09 | Selective Bullet Perforations | 406.90 | 408.10 | 0 |
1976-10-09 | Selective Bullet Perforations | 408.70 | 410.30 | 0 |
1976-10-09 | Selective Bullet Perforations | 410.90 | 430.70 | 0 |
1976-10-09 | Selective Bullet Perforations | 431.30 | 431.90 | 0 |
1976-10-14 | Fracture | 400.50 | 431.90 | 0 |
1976-10-27 | Selective Bullet Perforations | 387.10 | 387.70 | 0 |
1976-10-27 | Bullet Perforation | 388.30 | 390.10 | 3 |
1976-09-04 | Selective Bullet Perforations | 580.90 | 581.60 | 0 |
1976-10-27 | Selective Bullet Perforations | 390.80 | 391.40 | 0 |
1976-10-27 | Selective Bullet Perforations | 391.70 | 392.00 | 0 |
1976-10-27 | Selective Bullet Perforations | 392.60 | 393.20 | 0 |
1976-10-27 | Selective Bullet Perforations | 393.80 | 394.40 | 0 |
1976-10-27 | Selective Bullet Perforations | 395.00 | 395.60 | 0 |
1976-11-06 | Fracture | 387.10 | 395.60 | 0 |
1976-09-04 | Selective Bullet Perforations | 582.20 | 582.80 | 0 |
1976-09-04 | Selective Bullet Perforations | 583.40 | 584.00 | 0 |
1976-09-04 | Selective Bullet Perforations | 586.40 | 587.00 | 0 |
1976-09-04 | Selective Bullet Perforations | 589.80 | 590.70 | 0 |
1976-09-04 | Selective Bullet Perforations | 595.60 | 596.20 | 0 |
1976-09-04 | Selective Bullet Perforations | 597.40 | 613.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 8591 | 0.0 | 0.0 | 0.0 |
1978 | 8759 | 0.0 | 0.0 | 0.0 |
1979 | 8447 | 0.0 | 0.0 | 0.0 |
1980 | 8663 | 0.0 | 0.0 | 0.0 |
1981 | 8711 | 0.0 | 0.0 | 0.0 |
1982 | 8735 | 0.0 | 0.0 | 0.0 |
1983 | 8615 | 0.0 | 0.0 | 0.0 |
1984 | 8399 | 0.0 | 0.0 | 0.0 |
1985 | 7800 | 0.0 | 0.0 | 0.0 |
1986 | 8375 | 0.0 | 0.0 | 0.0 |
1987 | 8015 | 0.0 | 0.0 | 0.0 |
For data sources see[5]