X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124101510000

Well Details

Well ID: 0124101510000
Loading map...
Location: 00/10-15-012-10W4/0
Location Alias: 00/10-15-12-10 W4M
Location Alias 2: 00/10-15-012-10 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 10
Section: 15
County/Municipality: County of Forty Mile No. 8
Well Name: SOC BI 10-15-12-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0026600
License Date: 1964-08-04
License Status: Suspension
Spud Date: 1964-08-06
Final Drill Date: 1964-08-21
Well Total Depth: 940.30 m
Surface Hole Latitude: 49.998851
Surface Hole Longitude: -111.286894

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-08-04 Obtained License
1964-08-13 Drill Stem Test Performed
1964-08-21 Finished Drilling
1964-08-22 Drill Stem Test Performed
1964-08-23 Drill Stem Test Performed
1964-08-25 Production Casing Operation Performed
1964-08-25 Well Mode changed to Drilled and Cased
1971-09-12 Perforation Treatment Performed - Jet Perforation
1971-10-14 Perforation Treatment Performed - Jet Perforation
1971-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1971-10-16 Perforation Treatment Performed - Fractured
1992-10-09 Perforation Treatment Performed - Jet Perforation
1992-10-09 Well Mode changed to Drilled and Cased
2000-12-06 Perforation Treatment Performed - Jet Perforation
2000-12-06 Well Log Performed
2000-12-06 Well Mode changed to Drilled and Cased
2000-12-08 Perforation Treatment Performed - Chemical Squeeze
2005-09-01 Well Began Production
2005-09-01 Well Fluid changed to Gas
2005-09-01 Well Mode changed to Flowing
2010-11-01 Well Fluid changed to Gas
2010-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-09-12 Perforation 674.80 675.70 7
1971-10-14 Perforation 569.40 571.20 7
1971-10-15 Packing Device Capped w/Cement 594.40 594.40 0
1971-10-16 Fracture 569.40 571.20 0
1992-10-09 Perforation 674.80 675.70 7
2000-12-06 Perforation 117.50 120.00 13
2000-12-08 Chemical Squeeze 117.50 120.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 2915 0.0 0.0 0.0
2006 8548 0.0 0.0 0.0
2007 8713 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 6023 0.0 0.0 0.0
2010 7007 0.0 0.0 0.0

For data sources see[5]

References