X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124131110002

Well Details

Well ID: 0124131110002
Loading map...
Location: 00/10-11-012-13W4/2
Location Alias: 00/10-11-12-13 W4M
Location Alias 2: 00/10-11-012-13 W4/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 13
Section: 11
County/Municipality: Municipal District of Taber
Well Name: COGI BI 10-11-12-13
Operator Name: Canadian Oil & Gas International Inc.
License Number: 0045864
License Date: 1973-05-24
License Status: Issued
Spud Date: 1973-06-07
Final Drill Date: 1973-06-12
Well Total Depth: 922.00 m
Surface Hole Latitude: 49.985006
Surface Hole Longitude: -111.671649

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-05-24 Obtained License
1973-06-12 Drill Stem Test Performed
1973-06-12 Finished Drilling
1973-06-12 Well Mode changed to Drilled and Cased
1973-06-14 Production Casing Operation Performed
1973-06-23 Perforation Treatment Performed - Jet Perforation
1973-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-25 Perforation Treatment Performed - Cement Squeeze
1973-06-26 Perforation Treatment Performed - Jet Perforation
1973-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-08-10 Perforation Treatment Performed - Jet Perforation
1973-08-12 Perforation Treatment Performed - Acid Wash - No Pressure
1973-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-09-20 Perforation Treatment Performed - Abrasa-Jet Perforation
1973-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-09-21 Perforation Treatment Performed - Condensate Squeeze
2004-01-08 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-06-23 Perforation 897.30 897.90 3
1973-09-20 Hydra Jet Perforation 894.60 894.90 0
1973-09-21 Condensate Squeeze 894.60 897.90 0
1973-09-21 Acid Treatment 894.60 897.90 0
2004-01-08 Perforation 894.30 900.30 20
1973-06-24 Acid Treatment 897.30 897.90 0
1973-06-25 Cement Squeeze 897.30 897.90 0
1973-06-26 Perforation 897.30 897.90 3
1973-06-27 Acid Treatment 897.30 897.90 0
1973-06-28 Acid Treatment 897.30 897.90 0
1973-08-10 Perforation 894.90 895.20 0
1973-08-12 Acid Wash 894.90 895.20 0
1973-09-19 Acid Treatment 894.90 897.90 0

For data sources see[4]



References