X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124131207002

Well Details

Well ID: 0124131207002
Loading map...
Location: 00/07-12-012-13W4/2
Location Alias: 00/07-12-12-13 W4M
Location Alias 2: 00/07-12-012-13 W4/02
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 13
Section: 12
County/Municipality: Municipal District of Taber
Well Name: ENCAL ET AL BOW ISLAND 7-12-12-13
Operator Name: Trilogy Blue Mountain Ltd.
License Number: 0140986
License Date: 1989-09-20
License Status: RecCertified
Spud Date: 1990-01-24
Final Drill Date: 1990-01-28
Well Total Depth: 935.00 m
Surface Hole Latitude: 49.981160
Surface Hole Longitude: -111.651593

For data sources see[1][2]

Well History

Date Event
1989-09-20 Obtained License
1990-01-25 Direction Drilling Operation Performed - Deviate
1990-01-26 Production Casing Operation Performed
1990-01-28 Finished Drilling
1990-01-28 Well Log Performed
1990-01-28 Well Mode changed to Drilled and Cased
1990-01-29 Rig Released
1990-02-23 Perforation Treatment Performed - Jet Perforation
1990-03-02 Well Began Production
1990-03-02 Well Fluid changed to Crude Oil
1990-03-02 Well Mode changed to Pumping
1990-03-22 Well Log Performed
1992-09-30 Well Fluid changed to Crude Oil
1992-09-30 Well Mode changed to Suspended
1993-03-01 Well Fluid changed to Crude Oil
1993-03-01 Well Mode changed to Pumping
1993-05-01 Well Fluid changed to Crude Oil
1993-05-01 Well Mode changed to Suspended
1993-07-03 Well Log Performed
1993-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-04 Plug Back Performed
1993-07-04 Well Abandoned
1993-07-04 Well Fluid changed to Crude Oil
1993-07-04 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-01-25 561.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-23 Perforation 904.50 907.00 13
1993-07-04 Packing Device Capped w/Cement 890.00 898.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 6921 0.0 0.0 0.0
1991 7528 0.0 0.0 0.0
1992 6056 0.0 0.0 0.0
1993 479 0.0 0.0 0.0

For data sources see[6]

References