If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124131703020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.992509,"lon":-111.747329,"icon":""}]} |
Location: 02/03-17-012-13W4/0 | |
Location Alias: 02/03-17-12-13 W4M | |
Location Alias 2: 02/03-17-012-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 13 | |
Section: 17 | |
County/Municipality: Municipal District of Taber | |
Well Name: POINTER ET AL GRDFKS 3-17-12-13 | |
Operator Name: Petronas Energy Canada Ltd. | |
License Number: 0185597 | |
License Date: 1996-02-09 | |
License Status: Re-Entered | |
Spud Date: 1996-02-27 | |
Final Drill Date: 1996-03-01 | |
Well Total Depth: 942.00 m | |
Surface Hole Latitude: 49.992509 | |
Surface Hole Longitude: -111.747329 |
Date | Event |
---|---|
1996-02-09 | Obtained License |
1996-02-27 | Well Log Performed |
1996-02-28 | Surface Casing Operation Performed |
1996-03-01 | Finished Drilling |
1996-03-01 | Well Log Performed |
1996-03-01 | Well Mode changed to Drilled and Cased |
1996-03-02 | Production Casing Operation Performed |
1996-03-02 | Rig Released |
1996-03-11 | Perforation Treatment Performed - Jet Perforation |
1996-03-13 | Well Began Production |
1996-03-13 | Well Fluid changed to Crude Oil |
1996-03-13 | Well Mode changed to Pumping |
1997-05-01 | Well Fluid changed to Crude Oil |
1997-05-01 | Well Mode changed to Suspended |
2000-04-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-04-10 | Plug Back Performed |
2000-05-11 | Well Abandoned |
2000-05-11 | Well Fluid changed to Crude Oil |
2000-05-11 | Well Mode changed to Abandoned |
2002-05-11 | Well Fluid changed to Crude Oil |
2002-05-11 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-03-11 | Perforation | 910.50 | 913.50 | 18 |
2000-04-10 | Packing Device Capped w/Cement | 895.50 | 903.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 6949 | 0.0 | 0.0 | 0.0 |
1997 | 2040 | 0.0 | 0.0 | 0.0 |
For data sources see[5]