If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124170108020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.967406,"lon":-112.191619,"icon":""}]} |
Location: 02/08-01-012-17W4/0 | |
Location Alias: 02/08-01-12-17 W4M | |
Location Alias 2: 02/08-01-012-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 17 | |
Section: 01 | |
County/Municipality: Municipal District of Taber | |
Well Name: ROZSA TURIN 8-1-12-17 | |
Operator Name: Rozsa Petroleum Ltd. | |
License Number: 0117790 | |
License Date: 1985-09-20 | |
License Status: Re-Entered | |
Spud Date: 1985-10-09 | |
Final Drill Date: 1985-10-12 | |
Well Total Depth: 1058.40 m | |
Surface Hole Latitude: 49.967406 | |
Surface Hole Longitude: -112.191619 |
Date | Event |
---|---|
1985-09-20 | Obtained License |
1985-10-09 | Surface Casing Operation Performed |
1985-10-12 | Finished Drilling |
1985-10-12 | Well Log Performed |
1985-10-13 | Production Casing Operation Performed |
1985-10-14 | Rig Released |
1985-11-14 | Perforation Treatment Performed - Jet Perforation |
1985-11-15 | Perforation Treatment Performed - Jet Perforation |
1985-12-17 | Well Mode changed to Drilled and Cased |
1986-08-04 | Well Log Performed |
1993-04-04 | Well Began Production |
1993-04-04 | Well Fluid changed to Crude Oil |
1993-04-04 | Well Mode changed to Pumping |
1993-05-30 | Perforation Treatment Performed - Cement Squeeze |
1993-05-31 | Perforation Treatment Performed - Cement Plug |
1993-05-31 | Well Abandoned |
1993-05-31 | Well Fluid changed to Crude Oil |
1993-05-31 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-11-14 | Perforation | 1013.00 | 1014.50 | 13 |
1985-11-15 | Perforation | 1010.00 | 1012.00 | 13 |
1993-05-30 | Cement Squeeze | 1010.00 | 1012.00 | 0 |
1993-05-31 | Cement Plug | 949.20 | 1012.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 676 | 0.0 | 0.0 | 0.0 |
For data sources see[5]