If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124191314000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.002684,"lon":-112.476145,"icon":""}]} |
Location: 00/14-13-012-19W4/0 | |
Location Alias: 00/14-13-12-19 W4M | |
Location Alias 2: 00/14-13-012-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 19 | |
Section: 13 | |
County/Municipality: Lethbridge County | |
Well Name: SLE RETLAW 14-13-12-19 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0050234 | |
License Date: 1974-06-24 | |
License Status: Suspension | |
Spud Date: 1974-06-27 | |
Final Drill Date: 1974-07-04 | |
Well Total Depth: 1109.50 m | |
Surface Hole Latitude: 50.002684 | |
Surface Hole Longitude: -112.476145 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-06-24 | Obtained License |
1974-07-02 | Blow Occurred |
1974-07-04 | Finished Drilling |
1974-07-04 | Well Mode changed to Drilled and Cased |
1974-07-05 | Drill Stem Test Performed |
1974-07-06 | Production Casing Operation Performed |
1974-07-20 | Perforation Treatment Performed - Jet Perforation |
1974-07-26 | Well Began Production |
1974-07-26 | Well Fluid changed to Crude Oil |
1974-07-26 | Well Mode changed to Pumping |
1974-11-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1974-11-07 | Well Fluid changed to Crude Oil |
1974-11-07 | Well Mode changed to Abandoned Zone |
1974-11-08 | Perforation Treatment Performed - Jet Perforation |
1975-02-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1975-02-21 | Perforation Treatment Performed - Jet Perforation |
1975-02-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-02-25 | Perforation Treatment Performed - Cement Squeeze |
1976-06-15 | Perforation Treatment Performed - Jet Perforation |
1986-05-13 | Well Log Performed |
2007-02-16 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1974-07-20 | Perforation | 1092.40 | 1095.50 | 7 |
1974-11-07 | Packing Device Capped w/Cement | 1082.00 | 1089.70 | 0 |
1974-11-08 | Perforation | 1065.30 | 1070.80 | 7 |
1975-02-18 | Packing Device Capped w/Cement | 1021.10 | 1028.70 | 0 |
1975-02-21 | Perforation | 996.70 | 1004.30 | 7 |
1975-02-22 | Acid Treatment | 996.70 | 1004.30 | 0 |
1975-02-25 | Cement Squeeze | 996.70 | 1004.30 | 0 |
1976-06-15 | Perforation | 1065.30 | 1070.80 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1974 | 792 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1974-07-02 | Blow | 1085.00 | 1085.00 |
For data sources see[6]