If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0124191810002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.99935,"lon":-112.581187,"icon":""}]} |
Location: 00/10-18-012-19W4/2 | |
Location Alias: 00/10-18-12-19 W4M | |
Location Alias 2: 00/10-18-012-19 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 4 | |
Range: 19 | |
Section: 18 | |
County/Municipality: Lethbridge County | |
Well Name: SLE RETLAW 10-18-12-19 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0060608 | |
License Date: 1976-10-13 | |
License Status: Issued | |
Spud Date: 1976-10-14 | |
Final Drill Date: 1976-10-22 | |
Well Total Depth: 1155.20 m | |
Surface Hole Latitude: 49.999350 | |
Surface Hole Longitude: -112.581187 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-10-13 | Obtained License |
1976-10-15 | Lost Circulation Occurred |
1976-10-17 | Kick Occurred |
1976-10-22 | Finished Drilling |
1976-10-22 | Well Mode changed to Drilled and Cased |
1976-10-24 | Drill Stem Test Performed |
1976-10-25 | Production Casing Operation Performed |
1976-11-02 | Perforation Treatment Performed - Jet Perforation |
1976-12-21 | Perforation Treatment Performed - Jet Perforation |
1977-09-03 | Well Began Production |
1977-09-03 | Well Fluid changed to Gas |
1977-09-03 | Well Mode changed to Flowing |
1981-11-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-11-14 | Perforation Treatment Performed - Jet Perforation |
1985-06-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-06-25 | Perforation Treatment Performed - Cement Squeeze |
1985-06-25 | Plug Back Performed |
1985-06-28 | Perforation Treatment Performed - Jet Perforation |
1987-06-19 | Well Fluid changed to Gas |
1987-06-19 | Well Mode changed to Suspended |
2010-11-08 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-11-02 | Perforation | 1133.90 | 1136.90 | 7 |
1976-12-21 | Perforation | 843.00 | 844.00 | 13 |
1981-11-14 | Packing Device Capped w/Cement | 1122.90 | 1127.70 | 0 |
1981-11-14 | Perforation | 1113.00 | 1115.00 | 13 |
1985-06-25 | Acid Treatment | 1113.00 | 1115.00 | 0 |
1985-06-25 | Cement Squeeze | 1113.00 | 1115.00 | 0 |
1985-06-28 | Perforation | 1133.90 | 1136.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 2608 | 0.0 | 0.0 | 0.0 |
1978 | 5029 | 0.0 | 0.0 | 0.0 |
1979 | 5033 | 0.0 | 0.0 | 0.0 |
1980 | 4720 | 0.0 | 0.0 | 0.0 |
1981 | 4191 | 0.0 | 0.0 | 0.0 |
1982 | 4801 | 0.0 | 0.0 | 0.0 |
1983 | 3499 | 0.0 | 0.0 | 0.0 |
1984 | 3521 | 0.0 | 0.0 | 0.0 |
1985 | 3746 | 0.0 | 0.0 | 0.0 |
1986 | 3921 | 0.0 | 0.0 | 0.0 |
1987 | 655 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1976-10-15 | Lost Circulation | 122.00 | 187.10 |
1976-10-17 | Kick | 533.40 | 533.40 |
For data sources see[6]