X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0124211006000

Well Details

Well ID: 0124211006000
Loading map...
Location: 00/06-10-012-21W4/0
Location Alias: 00/06-10-12-21 W4M
Location Alias 2: 00/06-10-012-21 W4/00
Country: Canada
Province: Alberta
Township: 012
Meridian: 4
Range: 21
Section: 10
County/Municipality: Lethbridge County
Well Name: HOUSTON KEHO 6-10-12-21
Operator Name: Houston Oil & Gas Ltd.
License Number: 0103547
License Date: 1983-10-13
License Status: Suspension
Spud Date: 1983-10-24
Final Drill Date: 1983-10-29
Well Total Depth: 1013.00 m
Surface Hole Latitude: 49.981909
Surface Hole Longitude: -112.791924

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-10-13 Obtained License
1983-10-28 Drill Stem Test Performed
1983-10-29 Finished Drilling
1983-10-29 Well Mode changed to Drilled and Cased
1983-10-30 Drill Stem Test Performed
1983-10-31 Production Casing Operation Performed
1983-11-03 Well Log Performed
1983-11-08 Perforation Treatment Performed - Jet Perforation
1983-11-13 Well Began Production
1983-11-13 Well Fluid changed to Crude Oil
1983-11-13 Well Mode changed to Pumping
1985-02-22 Perforation Treatment Performed - Fractured
1995-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-28 Well Log Performed
2000-07-26 Well Log Performed
2006-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-14 Plug Back Performed
2006-07-14 Well Fluid changed to Crude Oil
2006-07-14 Well Mode changed to Abandoned Zone
2006-07-16 Well Log Performed
2006-07-19 Perforation Treatment Performed - Jet Perforation
2006-07-19 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-11-08 Perforation 955.00 956.50 13
1985-02-22 Fracture 955.00 956.50 0
1995-02-23 Acid Treatment 955.00 956.50 0
2006-07-14 Packing Device Capped w/Cement 937.60 945.60 0
2006-07-19 Perforation 269.50 271.00 17
2006-07-19 Remedial Casing Cementing 269.50 271.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 1067 0.0 0.0 0.0
1984 8545 0.0 0.0 0.0
1985 7614 0.0 0.0 0.0
1986 7898 0.0 0.0 0.0
1987 3202 0.0 0.0 0.0
1988 8247 0.0 0.0 0.0
1989 8454 0.0 0.0 0.0
1990 8580 0.0 0.0 0.0
1991 1440 0.0 0.0 0.0
1993 4519 0.0 0.0 0.0
1994 8686 0.0 0.0 0.0
1995 8531 0.0 0.0 0.0
1996 8639 0.0 0.0 0.0
1997 8723 0.0 0.0 0.0
1998 2736 0.0 0.0 0.0
1999 1152 0.0 0.0 0.0

For data sources see[5]

References