If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0125010711002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.985903,"lon":-114.129115,"icon":""}]} |
Location: 00/11-07-012-01W5/2 | |
Location Alias: 00/11-07-12-01 W5M | |
Location Alias 2: 00/11-07-012-01 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 5 | |
Range: 01 | |
Section: 07 | |
County/Municipality: Municipal District of Ranchland No. 66 | |
Well Name: COMPTON PPINEH 11-7-12-1 | |
Operator Name: Lexin Resources Ltd. | |
License Number: 0243602 | |
License Date: 2000-10-26 | |
License Status: Amended | |
Spud Date: 2000-11-10 | |
Final Drill Date: 2001-01-08 | |
Well Total Depth: 3328.00 m | |
Surface Hole Latitude: 49.985903 | |
Surface Hole Longitude: -114.129115 |
Date | Event |
---|---|
2000-10-26 | Obtained License |
2000-11-16 | Surface Casing Operation Performed |
2000-11-25 | Kick Occurred |
2000-12-06 | Well Log Performed |
2000-12-07 | Well Log Performed |
2000-12-10 | Intermediate Casing Operation Performed |
2000-12-12 | Well Log Performed |
2000-12-16 | Kick Occurred |
2001-01-08 | Finished Drilling |
2001-01-08 | Well Log Performed |
2001-01-08 | Well Mode changed to Drilled and Cased |
2001-01-09 | Well Log Performed |
2001-01-13 | Liner Casing Operation Performed |
2001-01-15 | Rig Released |
2001-02-23 | Perforation Treatment Performed - Jet Perforation |
2001-02-23 | Well Log Performed |
2001-02-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-02-25 | Perforation Treatment Performed - Fractured |
2001-02-25 | Perforation Treatment Performed - Jet Perforation |
2001-02-26 | Well Log Performed |
2001-02-27 | Perforation Treatment Performed - Jet Perforation |
2001-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-02-28 | Perforation Treatment Performed - Fractured |
2001-02-28 | Perforation Treatment Performed - Jet Perforation |
2001-03-01 | Perforation Treatment Performed - Fractured |
2001-03-01 | Perforation Treatment Performed - Jet Perforation |
2001-03-01 | Well Log Performed |
2001-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-03-02 | Perforation Treatment Performed - Fractured |
2001-03-02 | Well Log Performed |
2001-03-03 | Perforation Treatment Performed - Fractured |
2001-03-03 | Perforation Treatment Performed - Jet Perforation |
2001-03-04 | Perforation Treatment Performed - Jet Perforation |
2001-03-04 | Well Log Performed |
2001-03-05 | Perforation Treatment Performed - Fractured |
2001-03-05 | Perforation Treatment Performed - Jet Perforation |
2001-03-05 | Well Log Performed |
2001-03-30 | Well Log Performed |
2001-04-14 | Well Log Performed |
2001-04-15 | Perforation Treatment Performed - Jet Perforation |
2001-04-16 | Perforation Treatment Performed - Fractured |
2001-04-16 | Perforation Treatment Performed - Jet Perforation |
2001-04-17 | Well Log Performed |
2001-04-21 | Perforation Treatment Performed - Fractured |
2001-04-21 | Perforation Treatment Performed - Jet Perforation |
2001-04-21 | Well Log Performed |
2001-04-22 | Perforation Treatment Performed - Fractured |
2001-04-22 | Perforation Treatment Performed - Jet Perforation |
2001-04-22 | Well Log Performed |
2001-04-23 | Perforation Treatment Performed - Fractured |
2001-04-23 | Perforation Treatment Performed - Jet Perforation |
2001-04-24 | Perforation Treatment Performed - Fractured |
2001-04-24 | Perforation Treatment Performed - Jet Perforation |
2001-04-24 | Well Log Performed |
2001-04-25 | Perforation Treatment Performed - Fractured |
2001-04-25 | Well Log Performed |
2001-05-03 | Perforation Treatment Performed - Jet Perforation |
2001-05-03 | Well Log Performed |
2001-05-04 | Perforation Treatment Performed - Jet Perforation |
2001-05-04 | Well Log Performed |
2001-05-05 | Perforation Treatment Performed - Fractured |
2001-05-05 | Well Log Performed |
2001-05-07 | Perforation Treatment Performed - Jet Perforation |
2001-05-07 | Well Log Performed |
2001-05-08 | Perforation Treatment Performed - Fractured |
2001-05-08 | Perforation Treatment Performed - Jet Perforation |
2001-05-08 | Well Log Performed |
2001-05-09 | Perforation Treatment Performed - Fractured |
2001-05-09 | Perforation Treatment Performed - Jet Perforation |
2001-05-09 | Well Log Performed |
2001-05-10 | Perforation Treatment Performed - Fractured |
2001-05-10 | Perforation Treatment Performed - Jet Perforation |
2001-05-10 | Well Log Performed |
2001-06-01 | Well Log Performed |
2006-04-04 | Perforation Treatment Performed - Jet Perforation |
2006-04-04 | Well Log Performed |
2006-04-06 | Perforation Treatment Performed - Fractured |
2006-04-27 | Well Began Production |
2006-04-27 | Well Fluid changed to Gas |
2006-04-27 | Well Mode changed to Flowing |
2006-05-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-02-23 | Perforation | 3177.00 | 3183.00 | 20 |
2001-02-27 | Perforation | 3012.00 | 3014.00 | 20 |
2001-02-28 | Packing Device Capped w/Cement | 3075.00 | 3078.00 | 0 |
2001-02-28 | Packing Device Capped w/Cement | 3005.00 | 3008.00 | 0 |
2001-02-28 | Fracture | 3050.00 | 3053.00 | 0 |
2001-02-28 | Fracture | 3039.00 | 3044.00 | 0 |
2001-02-28 | Fracture | 3033.00 | 3036.00 | 0 |
2001-02-28 | Fracture | 3027.00 | 3033.00 | 0 |
2001-02-28 | Fracture | 3019.00 | 3022.00 | 0 |
2001-02-28 | Fracture | 3012.00 | 3014.00 | 0 |
2001-02-28 | Perforation | 2987.00 | 2992.00 | 20 |
2001-02-24 | Acid Treatment | 3177.00 | 3183.00 | 0 |
2001-03-01 | Perforation | 2982.00 | 2987.00 | 20 |
2001-03-01 | Fracture | 2987.00 | 2992.00 | 0 |
2001-03-01 | Fracture | 2982.00 | 2987.00 | 0 |
2001-03-01 | Perforation | 2934.00 | 2939.00 | 20 |
2001-03-01 | Perforation | 2928.00 | 2933.00 | 20 |
2001-03-02 | Packing Device Capped w/Cement | 2970.00 | 2973.00 | 0 |
2001-03-02 | Fracture | 2934.00 | 2939.00 | 0 |
2001-03-02 | Fracture | 2928.00 | 2933.00 | 0 |
2001-03-03 | Perforation | 2885.00 | 2890.00 | 20 |
2001-03-03 | Perforation | 2880.00 | 2885.00 | 20 |
2001-02-25 | Perforation | 3080.00 | 3090.00 | 20 |
2001-03-03 | Fracture | 2885.00 | 2890.00 | 0 |
2001-03-03 | Fracture | 2880.00 | 2885.00 | 0 |
2001-03-03 | Perforation | 2747.00 | 2752.00 | 20 |
2001-03-03 | Perforation | 2739.00 | 2744.00 | 20 |
2001-03-03 | Perforation | 2729.00 | 2732.00 | 20 |
2001-03-03 | Fracture | 2747.00 | 2752.00 | 0 |
2001-03-03 | Fracture | 2739.00 | 2744.00 | 0 |
2001-03-03 | Fracture | 2729.00 | 2732.00 | 0 |
2001-03-04 | Perforation | 2702.00 | 2708.00 | 20 |
2001-03-05 | Fracture | 2702.00 | 2708.00 | 0 |
2001-02-25 | Fracture | 3080.00 | 3090.00 | 0 |
2001-03-05 | Perforation | 2676.00 | 2681.00 | 20 |
2001-04-15 | Perforation | 2642.00 | 2648.50 | 20 |
2001-04-16 | Fracture | 2676.00 | 2681.00 | 0 |
2001-04-16 | Fracture | 2642.50 | 2648.80 | 0 |
2001-04-16 | Perforation | 2584.00 | 2590.00 | 20 |
2001-04-16 | Fracture | 2584.00 | 2590.00 | 0 |
2001-04-21 | Perforation | 2520.00 | 2532.00 | 20 |
2001-04-21 | Fracture | 2520.00 | 2532.00 | 0 |
2001-04-22 | Perforation | 2438.00 | 2444.00 | 20 |
2001-04-22 | Fracture | 2438.00 | 2444.00 | 0 |
2001-02-27 | Perforation | 3050.00 | 3053.00 | 20 |
2001-04-22 | Perforation | 2400.50 | 2403.50 | 20 |
2001-04-23 | Perforation | 2390.50 | 2393.00 | 20 |
2001-04-23 | Fracture | 2400.50 | 2403.50 | 0 |
2001-04-23 | Fracture | 2390.50 | 2393.50 | 0 |
2001-04-24 | Perforation | 2338.00 | 2342.00 | 20 |
2001-04-24 | Perforation | 2357.00 | 2361.00 | 20 |
2001-04-24 | Fracture | 2338.00 | 2342.00 | 0 |
2001-04-24 | Fracture | 2357.00 | 2361.00 | 0 |
2001-04-24 | Perforation | 2286.00 | 2291.00 | 20 |
2001-04-25 | Fracture | 2286.00 | 2291.00 | 0 |
2001-02-27 | Perforation | 3039.00 | 3044.00 | 20 |
2001-05-03 | Perforation | 2213.00 | 2219.00 | 17 |
2001-05-04 | Perforation | 2199.00 | 2203.00 | 17 |
2001-05-04 | Perforation | 2092.00 | 2098.00 | 17 |
2001-05-04 | Perforation | 2076.00 | 2082.00 | 17 |
2001-05-05 | Fracture | 2213.00 | 2219.00 | 0 |
2001-05-05 | Fracture | 2199.00 | 2203.00 | 0 |
2001-05-05 | Fracture | 2092.00 | 2098.00 | 0 |
2001-05-05 | Fracture | 2076.00 | 2082.00 | 0 |
2001-05-07 | Perforation | 2009.00 | 2015.00 | 17 |
2001-05-08 | Fracture | 2009.00 | 2015.00 | 0 |
2001-02-27 | Perforation | 3033.00 | 3036.00 | 20 |
2001-05-08 | Perforation | 1953.00 | 1956.00 | 17 |
2001-05-08 | Perforation | 1942.00 | 1945.00 | 17 |
2001-05-08 | Perforation | 1908.00 | 1914.00 | 17 |
2001-05-08 | Fracture | 1953.00 | 1956.00 | 0 |
2001-05-08 | Fracture | 1942.00 | 1945.00 | 0 |
2001-05-08 | Fracture | 1908.00 | 1914.00 | 0 |
2001-05-09 | Perforation | 1850.00 | 1856.00 | 17 |
2001-05-09 | Fracture | 1850.00 | 1856.00 | 0 |
2001-05-10 | Perforation | 1751.00 | 1757.00 | 17 |
2001-05-10 | Fracture | 1751.00 | 1757.00 | 0 |
2001-02-27 | Perforation | 3027.00 | 3033.00 | 20 |
2006-04-04 | Perforation | 1440.50 | 1445.50 | 17 |
2006-04-06 | Fracture | 1440.50 | 1445.50 | 0 |
2001-02-27 | Perforation | 3019.00 | 3022.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 89 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2000-11-25 | Kick | 1756.00 | 1756.00 |
2000-12-16 | Kick | 2440.00 | 2440.00 |
For data sources see[6]