If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0125021215002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.985813,"lon":-114.129269,"icon":""}]} |
Location: 00/15-12-012-02W5/2 | |
Location Alias: 00/15-12-12-02 W5M | |
Location Alias 2: 00/15-12-012-02 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 012 | |
Meridian: 5 | |
Range: 02 | |
Section: 12 | |
County/Municipality: Municipal District of Ranchland No. 66 | |
Well Name: BP MARATHON CALLUM 15-12-12-2 | |
Operator Name: Lexin Resources Ltd. | |
License Number: 0254148 | |
License Date: 2001-04-17 | |
License Status: RecExempt | |
Spud Date: 2001-07-29 | |
Final Drill Date: 2001-09-10 | |
Well Total Depth: 3130.00 m | |
Surface Hole Latitude: 49.985813 | |
Surface Hole Longitude: -114.129269 |
Date | Event |
---|---|
2001-04-17 | Obtained License |
2001-07-30 | Direction Drilling Operation Performed - Deviate |
2001-08-04 | Surface Casing Operation Performed |
2001-08-23 | Direction Drilling Operation Performed - Deviate |
2001-09-10 | Finished Drilling |
2001-09-10 | Well Log Performed |
2001-09-11 | Well Log Performed |
2001-09-14 | Well Log Performed |
2001-09-15 | Well Log Performed |
2001-09-20 | Production Casing Operation Performed |
2001-09-22 | Rig Released |
2001-09-22 | Well Mode changed to Drilled and Cased |
2001-09-28 | Perforation Treatment Performed - Jet Perforation |
2001-09-30 | Perforation Treatment Performed - Fractured |
2001-09-30 | Perforation Treatment Performed - Jet Perforation |
2001-10-04 | Perforation Treatment Performed - Jet Perforation |
2001-10-05 | Perforation Treatment Performed - Fractured |
2001-10-05 | Perforation Treatment Performed - Jet Perforation |
2001-10-06 | Perforation Treatment Performed - Fractured |
2001-10-06 | Perforation Treatment Performed - Jet Perforation |
2001-10-15 | Well Began Production |
2001-10-15 | Well Fluid changed to Gas |
2001-10-15 | Well Mode changed to Flowing |
2004-10-01 | Perforation Treatment Performed - Jet Perforation |
2004-10-01 | Well Log Performed |
2004-10-04 | Perforation Treatment Performed - Fractured |
2010-01-11 | Perforation Treatment Performed - Cement Plug |
2010-01-11 | Plug Back Performed |
2010-01-11 | Well Fluid changed to Gas |
2010-01-11 | Well Mode changed to Abandoned Zone |
2010-01-14 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2001-07-30 | 100.00 | Deviate (5 - 79 degrees) |
2001-08-23 | 1385.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-09-28 | Perforation | 3061.00 | 3064.00 | 20 |
2001-10-06 | Perforation | 2343.00 | 2346.00 | 20 |
2001-10-06 | Fracture | 2343.00 | 2346.00 | 0 |
2001-10-06 | Perforation | 2303.00 | 2306.00 | 20 |
2001-10-06 | Perforation | 2030.00 | 2033.00 | 20 |
2001-10-06 | Fracture | 2030.00 | 2033.00 | 0 |
2004-10-01 | Perforation | 1808.00 | 1812.00 | 20 |
2004-10-04 | Fracture | 1808.00 | 1812.00 | 0 |
2010-01-11 | Cement Plug | 1425.00 | 3083.00 | 0 |
2001-09-30 | Fracture | 3061.00 | 3064.00 | 0 |
2001-09-30 | Perforation | 2938.00 | 2941.00 | 20 |
2001-09-30 | Fracture | 2938.00 | 2941.00 | 0 |
2001-09-30 | Perforation | 2885.00 | 2888.00 | 20 |
2001-10-04 | Perforation | 2628.00 | 2631.00 | 20 |
2001-10-05 | Fracture | 2628.00 | 2631.00 | 0 |
2001-10-05 | Perforation | 2498.00 | 2501.00 | 20 |
2001-10-05 | Fracture | 2498.00 | 2501.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 755 | 0.0 | 0.0 | 0.0 |
2002 | 713 | 0.0 | 0.0 | 0.0 |
2003 | 518 | 0.0 | 0.0 | 0.0 |
2004 | 404 | 0.0 | 0.0 | 0.0 |
For data sources see[6]