If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134032607000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.109912,"lon":-110.307128,"icon":""}]} |
Location: 00/07-26-013-03W4/0 | |
Location Alias: 00/07-26-13-03 W4M | |
Location Alias 2: 00/07-26-013-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 03 | |
Section: 26 | |
County/Municipality: Cypress County | |
Well Name: DEML MEDHAT 7-26-13-3 | |
Operator Name: Direct Energy Marketing Limited | |
License Number: 0042623 | |
License Date: 1972-05-31 | |
License Status: RecCertified | |
Spud Date: 1972-06-19 | |
Final Drill Date: 1972-06-20 | |
Well Total Depth: 432.80 m | |
Surface Hole Latitude: 50.109912 | |
Surface Hole Longitude: -110.307128 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1972-05-31 | Obtained License |
1972-06-20 | Finished Drilling |
1972-06-20 | Production Casing Operation Performed |
1972-07-04 | Perforation Treatment Performed - Bullet Perforation |
1972-10-15 | Perforation Treatment Performed - Fractured |
1973-05-04 | Well Mode changed to Drilled and Cased |
1974-11-19 | Well Began Production |
1974-11-19 | Well Fluid changed to Gas |
1974-11-19 | Well Mode changed to Flowing |
1981-07-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-07-30 | Well Fluid changed to Gas |
1981-07-30 | Well Mode changed to Abandoned |
1998-09-14 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1972-07-04 | Bullet Perforation | 400.80 | 401.10 | 7 |
1972-07-04 | Bullet Perforation | 345.90 | 349.90 | 7 |
1972-07-04 | Bullet Perforation | 340.50 | 345.00 | 7 |
1972-07-04 | Bullet Perforation | 335.60 | 336.20 | 7 |
1972-07-04 | Bullet Perforation | 332.20 | 332.50 | 7 |
1972-07-04 | Bullet Perforation | 323.40 | 330.40 | 7 |
1972-10-15 | Fracture | 323.40 | 401.10 | 0 |
1981-07-30 | Packing Device Capped w/Cement | 297.00 | 305.00 | 0 |
1972-07-04 | Bullet Perforation | 398.10 | 398.40 | 7 |
1972-07-04 | Bullet Perforation | 390.40 | 395.30 | 7 |
1972-07-04 | Bullet Perforation | 387.40 | 389.50 | 7 |
1972-07-04 | Bullet Perforation | 385.60 | 385.90 | 7 |
1972-07-04 | Bullet Perforation | 383.10 | 383.40 | 7 |
1972-07-04 | Bullet Perforation | 380.10 | 381.30 | 7 |
1972-07-04 | Bullet Perforation | 375.20 | 375.80 | 7 |
1972-07-04 | Bullet Perforation | 350.20 | 374.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1974 | 720 | 0.0 | 0.0 | 0.0 |
1975 | 5622 | 0.0 | 0.0 | 0.0 |
1976 | 7244 | 0.0 | 0.0 | 0.0 |
1977 | 8747 | 0.0 | 0.0 | 0.0 |
1978 | 8468 | 0.0 | 0.0 | 0.0 |
1979 | 6571 | 0.0 | 0.0 | 0.0 |
1980 | 5051 | 0.0 | 0.0 | 0.0 |
1981 | 5810 | 0.0 | 0.0 | 0.0 |
For data sources see[5]