X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134041807000

Well Details

Well ID: 0134041807000
Loading map...
Location: 00/07-18-013-04W4/0
Location Alias: 00/07-18-13-04 W4M
Location Alias 2: 00/07-18-013-04 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 04
Section: 18
County/Municipality: Cypress County
Well Name: MEDICINE HAT #79
Operator Name: City Of Medicine Hat
License Number: B0001865
License Date: 1947-09-10
License Status: Issued
Spud Date: 1947-09-21
Final Drill Date: 1947-10-08
Well Total Depth: 414.20 m
Surface Hole Latitude: 50.083697
Surface Hole Longitude: -110.538389

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1947-09-10 Obtained License
1947-10-03 Production Casing Operation Performed
1947-10-08 Finished Drilling
1947-10-08 Well Mode changed to Drilled and Cased
1947-10-09 Perforation Treatment Performed - Open-Hole Completion
1947-10-09 Well Began Production
1947-10-09 Well Fluid changed to Gas
1947-10-09 Well Mode changed to Flowing
1973-07-16 Perforation Treatment Performed - Cement Squeeze
1973-07-16 Perforation Treatment Performed - Selective Jet Perforations
1973-07-17 Perforation Treatment Performed - Cement Squeeze
1973-07-17 Perforation Treatment Performed - Jet Perforation
1973-07-17 Perforation Treatment Performed - Selective Jet Perforations
1973-08-17 Perforation Treatment Performed - Cement Squeeze
1973-08-17 Perforation Treatment Performed - Selective Jet Perforations
1973-08-21 Perforation Treatment Performed - Cement Squeeze
1973-10-10 Perforation Treatment Performed - Bullet Perforation
1973-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-10-29 Perforation Treatment Performed - Fractured
1974-10-20 Perforation Treatment Performed - Bullet Perforation
1974-10-20 Perforation Treatment Performed - Selective Bullet Perforations
1974-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-10-28 Perforation Treatment Performed - Fractured
1984-08-02 Perforation Treatment Performed - Selective Jet Perforations
1984-09-19 Perforation Treatment Performed - Acid Wash - No Pressure
1984-09-20 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1947-10-09 Open Hole/Barefoot Completion 331.00 344.40 0
1973-08-21 Cement Squeeze 207.60 219.20 0
1973-10-10 Bullet Perforation 374.60 383.70 3
1973-10-29 Acid Treatment 374.60 383.70 0
1973-10-29 Fracture 374.60 383.70 0
1974-10-20 Selective Bullet Perforations 364.80 368.80 0
1974-10-20 Selective Bullet Perforations 359.10 362.10 0
1974-10-20 Selective Bullet Perforations 356.60 357.50 0
1974-10-20 Selective Bullet Perforations 355.10 355.10 0
1974-10-20 Bullet Perforation 348.40 353.30 3
1974-10-20 Selective Bullet Perforations 342.60 343.80 0
1973-07-16 Selective Jet Perforations 243.50 243.50 7
1974-10-20 Selective Bullet Perforations 340.20 341.40 0
1974-10-20 Selective Bullet Perforations 338.00 338.90 0
1974-10-20 Selective Bullet Perforations 335.30 337.70 0
1974-10-20 Selective Bullet Perforations 332.80 334.10 0
1974-10-27 Acid Treatment 332.80 368.80 0
1974-10-28 Fracture 332.80 368.80 0
1984-08-02 Selective Jet Perforations 251.30 252.40 0
1984-08-02 Selective Jet Perforations 254.80 256.00 0
1984-08-02 Selective Jet Perforations 257.00 258.00 0
1984-08-02 Selective Jet Perforations 265.20 267.30 0
1973-07-16 Cement Squeeze 243.50 243.50 0
1984-08-02 Selective Jet Perforations 273.30 273.90 0
1984-08-02 Selective Jet Perforations 274.50 275.40 0
1984-08-02 Selective Jet Perforations 275.50 283.30 0
1984-08-02 Selective Jet Perforations 285.30 286.10 0
1984-08-02 Selective Jet Perforations 288.00 291.10 0
1984-08-02 Selective Jet Perforations 301.00 303.00 0
1984-09-19 Acid Wash 251.30 303.00 0
1984-09-20 Fracture 251.30 303.00 0
1973-07-17 Selective Jet Perforations 210.90 213.10 7
1973-07-17 Selective Jet Perforations 207.60 207.60 13
1973-07-17 Perforation 150.00 150.60 3
1973-07-17 Cement Squeeze 150.00 213.10 0
1973-08-17 Selective Jet Perforations 219.20 219.20 7
1973-08-17 Cement Squeeze 219.20 219.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 4416 0.0 0.0 0.0
1970 2976 0.0 0.0 0.0
1971 1156 0.0 0.0 0.0
1972 816 0.0 0.0 0.0
1974 3431 0.0 0.0 0.0
1975 5808 0.0 0.0 0.0
1976 4344 0.0 0.0 0.0
1977 4152 0.0 0.0 0.0
1978 2808 0.0 0.0 0.0
1979 2184 0.0 0.0 0.0
1980 4152 0.0 0.0 0.0
1981 2592 0.0 0.0 0.0
1982 3120 0.0 0.0 0.0
1983 2232 0.0 0.0 0.0
1984 3912 0.0 0.0 0.0
1985 3817 0.0 0.0 0.0
1986 2592 0.0 0.0 0.0
1987 3168 0.0 0.0 0.0
1988 4109 0.0 0.0 0.0
1989 7439 0.0 0.0 0.0
1990 4656 0.0 0.0 0.0
1991 7415 0.0 0.0 0.0
1992 7749 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8664 0.0 0.0 0.0
1996 8732 0.0 0.0 0.0
1997 8745 0.0 0.0 0.0
1998 8734 0.0 0.0 0.0
1999 8740 0.0 0.0 0.0
2000 8782 0.0 0.0 0.0
2001 8746 0.0 0.0 0.0
2002 8751 0.0 0.0 0.0
2003 8748 0.0 0.0 0.0
2004 8782 0.0 0.0 0.0
2005 8756 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8727 0.0 0.0 0.0
2008 8779 0.0 0.0 0.0
2009 8727 0.0 0.0 0.0
2010 8753 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8423 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8634 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8711 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8688 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References