If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134050203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.050066,"lon":-110.590269,"icon":""}]} |
Location: 00/03-02-013-05W4/0 | |
Location Alias: 00/03-02-13-05 W4M | |
Location Alias 2: 00/03-02-013-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 05 | |
Section: 02 | |
County/Municipality: Cypress County | |
Well Name: ENERMARK ETAL MEDHAT 3-2-13-5 | |
Operator Name: Enerplus Corporation | |
License Number: 0141773 | |
License Date: 1989-11-17 | |
License Status: Abandoned | |
Spud Date: 1989-11-23 | |
Final Drill Date: 1989-11-25 | |
Well Total Depth: 880.00 m | |
Surface Hole Latitude: 50.050066 | |
Surface Hole Longitude: -110.590269 |
Date | Event |
---|---|
1989-11-17 | Obtained License |
1989-11-24 | Surface Casing Operation Performed |
1989-11-25 | Finished Drilling |
1989-11-25 | Well Log Performed |
1989-11-25 | Well Mode changed to Drilled and Cased |
1989-11-26 | Production Casing Operation Performed |
1989-11-26 | Rig Released |
1990-01-05 | Well Log Performed |
1990-01-06 | Perforation Treatment Performed - Jet Perforation |
1990-01-23 | Well Began Production |
1990-01-23 | Well Fluid changed to Crude Oil |
1990-01-23 | Well Mode changed to Pumping |
2004-09-16 | Well Fluid changed to Crude Oil |
2004-09-16 | Well Mode changed to Suspended |
2014-06-24 | Well Log Performed |
2014-06-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-06-29 | Plug Back Performed |
2014-06-29 | Well Fluid changed to Crude Oil |
2014-06-29 | Well Mode changed to Abandoned Zone |
2014-06-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-07-24 | Well Abandoned |
2014-07-24 | Well Fluid changed to Crude Oil |
2014-07-24 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-01-06 | Perforation | 847.00 | 850.00 | 13 |
1990-01-06 | Perforation | 850.50 | 851.50 | 13 |
2014-06-29 | Packing Device Capped w/Cement | 230.00 | 842.00 | 0 |
2014-06-30 | Packing Device Capped w/Cement | 193.80 | 201.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 6978 | 0.0 | 0.0 | 0.0 |
1991 | 3922 | 0.0 | 0.0 | 0.0 |
1992 | 8753 | 0.0 | 0.0 | 0.0 |
1993 | 8054 | 0.0 | 0.0 | 0.0 |
1994 | 8753 | 0.0 | 0.0 | 0.0 |
1995 | 8739 | 0.0 | 0.0 | 0.0 |
1996 | 8352 | 0.0 | 0.0 | 0.0 |
1997 | 8543 | 0.0 | 0.0 | 0.0 |
1998 | 8399 | 0.0 | 0.0 | 0.0 |
1999 | 3312 | 0.0 | 0.0 | 0.0 |
2000 | 7823 | 0.0 | 0.0 | 0.0 |
2001 | 4728 | 0.0 | 0.0 | 0.0 |
2002 | 720 | 0.0 | 0.0 | 0.0 |
2003 | 1559 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-07-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]