Well ID: 0134050304050 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.052485,"lon":-110.593109,"icon":""}]} |
Location: 05/04-03-013-05W4/0 | |
Location Alias: 05/04-03-13-05 W4M | |
Location Alias 2: 05/04-03-013-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 05 | |
Section: 03 | |
County/Municipality: Cypress County | |
Well Name: ENERPLUS CORP 105 MEDHAT 4-3-13-5 | |
Operator Name: Enerplus Corporation | |
License Number: 0434578 | |
License Date: 2011-06-23 | |
License Status: Issued | |
Spud Date: 2011-08-19 | |
Final Drill Date: 2011-08-27 | |
Well Total Depth: 2285.00 m | |
Surface Hole Latitude: 50.052485 | |
Surface Hole Longitude: -110.593109 |
Date | Event |
---|---|
2011-06-23 | Obtained License |
2011-08-21 | Surface Casing Operation Performed |
2011-08-21 | Well Log Performed |
2011-08-23 | Direction Drilling Operation Performed - Horizontal |
2011-08-24 | Intermediate Casing Operation Performed |
2011-08-27 | Finished Drilling |
2011-08-27 | Well Mode changed to Drilled and Cased |
2011-08-28 | Liner Casing Operation Performed |
2011-08-28 | Perforation Treatment Performed - Slotted Liner or Casing |
2011-08-29 | Rig Released |
2011-09-08 | Well Log Performed |
2011-11-02 | Well Began Production |
2011-11-02 | Well Fluid changed to Crude Oil |
2011-11-02 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-23 | 988.20 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-28 | Slotted Liner | 1055.00 | 2285.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1392 | 0.0 | 0.0 | 0.0 |
2012 | 7165 | 0.0 | 0.0 | 0.0 |
2013 | 8501 | 0.0 | 0.0 | 0.0 |
2014 | 8278 | 0.0 | 0.0 | 0.0 |
2015 | 7994 | 0.0 | 0.0 | 0.0 |
2016 | 8030 | 0.0 | 0.0 | 0.0 |
2017 | 8492 | 0.0 | 0.0 | 0.0 |
2018 | 8704 | 0.0 | 0.0 | 0.0 |
2019 | 8021 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[6]