If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134050305020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.052461,"lon":-110.595339,"icon":""}]} |
Location: 02/05-03-013-05W4/0 | |
Location Alias: 02/05-03-13-05 W4M | |
Location Alias 2: 02/05-03-013-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 05 | |
Section: 03 | |
County/Municipality: Cypress County | |
Well Name: ENERMARK 02 HZ MEDHAT 5-3-13-5 | |
Operator Name: Enerplus Corporation | |
License Number: 0189430 | |
License Date: 1996-07-08 | |
License Status: Amended | |
Spud Date: 1996-07-13 | |
Final Drill Date: 1996-07-22 | |
Well Total Depth: 2225.00 m | |
Surface Hole Latitude: 50.052461 | |
Surface Hole Longitude: -110.595339 |
Date | Event |
---|---|
1996-07-08 | Obtained License |
1996-07-13 | Lost Circulation Occurred |
1996-07-13 | Surface Casing Operation Performed |
1996-07-15 | Direction Drilling Operation Performed - Horizontal |
1996-07-15 | Well Log Performed |
1996-07-17 | Production Casing Operation Performed |
1996-07-22 | Finished Drilling |
1996-07-22 | Perforation Treatment Performed - Open-Hole Completion |
1996-07-22 | Rig Released |
1996-07-22 | Well Mode changed to Drilled and Cased |
1996-07-29 | Well Log Performed |
1996-08-09 | Well Began Production |
1996-08-09 | Well Fluid changed to Crude Oil |
1996-08-09 | Well Mode changed to Flowing |
2001-04-16 | Well Began Injection |
2001-04-16 | Well Fluid changed to Water |
2001-04-16 | Well Type changed to Injection |
2012-06-27 | Liner Casing Operation Performed |
2012-06-29 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-07-15 | 680.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-07-22 | Open Hole/Barefoot Completion | 949.00 | 2225.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 3474 | 0.0 | 0.0 | 0.0 |
1997 | 8739 | 0.0 | 0.0 | 0.0 |
1998 | 8395 | 0.0 | 0.0 | 0.0 |
1999 | 7789 | 0.0 | 0.0 | 0.0 |
2000 | 8763 | 0.0 | 0.0 | 0.0 |
2001 | 1848 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1996-07-13 | Lost Circulation | 29.00 | 161.00 |
2012-07-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]