If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134051004020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.068544,"lon":-110.617307,"icon":""}]} |
Location: 02/04-10-013-05W4/0 | |
Location Alias: 02/04-10-13-05 W4M | |
Location Alias 2: 02/04-10-013-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 05 | |
Section: 10 | |
County/Municipality: Cypress County | |
Well Name: ENERMARK ETAL 2A HZ MEDHAT 2-10-13-5 | |
Operator Name: Enerplus Corporation | |
License Number: 0187067 | |
License Date: 1996-03-29 | |
License Status: Amended | |
Spud Date: 1996-04-20 | |
Final Drill Date: 1996-04-27 | |
Well Total Depth: 1425.00 m | |
Surface Hole Latitude: 50.068544 | |
Surface Hole Longitude: -110.617307 |
Date | Event |
---|---|
1996-03-29 | Obtained License |
1996-04-20 | Surface Casing Operation Performed |
1996-04-20 | Well Log Performed |
1996-04-22 | Direction Drilling Operation Performed - Horizontal |
1996-04-22 | Well Log Performed |
1996-04-25 | Production Casing Operation Performed |
1996-04-27 | Finished Drilling |
1996-04-27 | Perforation Treatment Performed - Open-Hole Completion |
1996-04-27 | Well Structure changed to Drain |
1996-05-01 | Rig Released |
1996-05-03 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-04-22 | 621.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-04-27 | Open Hole/Barefoot Completion | 974.00 | 1425.00 | 0 |
For data sources see[5]