If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134051512020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.076404,"lon":-110.615005,"icon":""}]} |
Location: 02/12-15-013-05W4/0 | |
Location Alias: 02/12-15-13-05 W4M | |
Location Alias 2: 02/12-15-013-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 05 | |
Section: 15 | |
County/Municipality: Cypress County | |
Well Name: ENERMARK 02 HZ MEDHAT 12-15-13-5 | |
Operator Name: Enerplus Corporation | |
License Number: 0184231 | |
License Date: 1996-01-08 | |
License Status: Amended | |
Spud Date: 1996-01-22 | |
Final Drill Date: 1996-02-06 | |
Well Total Depth: 2151.00 m | |
Surface Hole Latitude: 50.076404 | |
Surface Hole Longitude: -110.615005 |
Date | Event |
---|---|
1996-01-08 | Obtained License |
1996-01-22 | Well Log Performed |
1996-01-23 | Surface Casing Operation Performed |
1996-01-25 | Well Log Performed |
1996-01-26 | Direction Drilling Operation Performed - Horizontal |
1996-01-29 | Production Casing Operation Performed |
1996-02-06 | Finished Drilling |
1996-02-06 | Perforation Treatment Performed - Open-Hole Completion |
1996-02-06 | Well Mode changed to Drilled and Cased |
1996-02-07 | Rig Released |
1996-02-08 | Well Log Performed |
1996-04-22 | Well Began Production |
1996-04-22 | Well Fluid changed to Crude Oil |
1996-04-22 | Well Mode changed to Flowing |
2002-03-06 | Well Fluid changed to Crude Oil |
2002-03-06 | Well Mode changed to Pumping |
2007-03-20 | Well Began Injection |
2007-03-20 | Well Fluid changed to Water |
2007-03-20 | Well Type changed to Injection |
2007-08-08 | Well Log Performed |
2007-09-11 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-01-26 | 620.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-02-06 | Open Hole/Barefoot Completion | 1025.00 | 2151.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 6107 | 0.0 | 0.0 | 0.0 |
1997 | 8637 | 0.0 | 0.0 | 0.0 |
1998 | 8734 | 0.0 | 0.0 | 0.0 |
1999 | 8678 | 0.0 | 0.0 | 0.0 |
2000 | 8437 | 0.0 | 0.0 | 0.0 |
2001 | 6024 | 0.0 | 0.0 | 0.0 |
2002 | 8065 | 0.0 | 0.0 | 0.0 |
2003 | 7526 | 0.0 | 0.0 | 0.0 |
2004 | 5543 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]