If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134051514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.090385,"lon":-110.613021,"icon":""}]} |
Location: 00/14-15-013-05W4/0 | |
Location Alias: 00/14-15-13-05 W4M | |
Location Alias 2: 00/14-15-013-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 05 | |
Section: 15 | |
County/Municipality: Cypress County | |
Well Name: PCP MEDICINE HAT 14-15-13-5 | |
Operator Name: City Of Medicine Hat | |
License Number: 0115709 | |
License Date: 1985-06-27 | |
License Status: Issued | |
Spud Date: 1985-11-24 | |
Final Drill Date: 1985-11-30 | |
Well Total Depth: 901.00 m | |
Surface Hole Latitude: 50.090385 | |
Surface Hole Longitude: -110.613021 |
Date | Event |
---|---|
1985-06-27 | Obtained License |
1985-11-24 | Lost Circulation Occurred |
1985-11-24 | Surface Casing Operation Performed |
1985-11-30 | Finished Drilling |
1985-11-30 | Well Log Performed |
1985-12-01 | Plug Back Performed |
1985-12-01 | Well Log Performed |
1985-12-02 | Production Casing Operation Performed |
1985-12-02 | Rig Released |
1985-12-02 | Well Mode changed to Drilled and Cased |
1986-07-30 | Perforation Treatment Performed - Selective Jet Perforations |
1986-08-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-08-08 | Perforation Treatment Performed - Fractured |
1986-08-13 | Perforation Treatment Performed - Selective Jet Perforations |
1986-08-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-08-26 | Perforation Treatment Performed - Fractured |
1986-11-03 | Well Began Production |
1986-11-03 | Well Fluid changed to Gas |
1986-11-03 | Well Mode changed to Flowing |
1998-10-24 | Perforation Treatment Performed - Jet Perforation |
1998-10-29 | Perforation Treatment Performed - Fractured |
1998-11-06 | Well Fluid changed to Gas |
1998-11-06 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-07-30 | Selective Jet Perforations | 393.40 | 394.00 | 0 |
1986-07-30 | Selective Jet Perforations | 371.00 | 371.20 | 0 |
1986-08-07 | Acid Treatment | 371.00 | 394.00 | 0 |
1986-08-08 | Fracture | 371.00 | 394.00 | 0 |
1986-08-13 | Selective Jet Perforations | 270.10 | 270.10 | 0 |
1986-08-13 | Selective Jet Perforations | 273.80 | 274.10 | 0 |
1986-08-13 | Selective Jet Perforations | 283.40 | 283.80 | 0 |
1986-08-13 | Selective Jet Perforations | 295.60 | 296.10 | 0 |
1986-08-13 | Selective Jet Perforations | 297.00 | 297.20 | 0 |
1986-08-13 | Selective Jet Perforations | 302.40 | 305.00 | 0 |
1986-08-13 | Selective Jet Perforations | 305.60 | 305.90 | 0 |
1986-07-30 | Selective Jet Perforations | 394.40 | 394.80 | 0 |
1986-08-13 | Selective Jet Perforations | 309.30 | 309.70 | 0 |
1986-08-13 | Selective Jet Perforations | 310.00 | 312.20 | 0 |
1986-08-13 | Selective Jet Perforations | 318.90 | 319.20 | 0 |
1986-08-25 | Acid Treatment | 270.10 | 319.20 | 0 |
1986-08-26 | Fracture | 270.10 | 319.20 | 0 |
1998-10-24 | Perforation | 351.30 | 357.30 | 13 |
1998-10-29 | Fracture | 351.30 | 357.30 | 0 |
1986-07-30 | Selective Jet Perforations | 395.40 | 396.00 | 0 |
1986-07-30 | Selective Jet Perforations | 396.20 | 396.40 | 0 |
1986-07-30 | Selective Jet Perforations | 396.70 | 396.70 | 0 |
1986-07-30 | Selective Jet Perforations | 397.80 | 398.00 | 0 |
1986-07-30 | Selective Jet Perforations | 399.00 | 399.30 | 0 |
1986-07-30 | Selective Jet Perforations | 368.40 | 369.60 | 0 |
1986-07-30 | Selective Jet Perforations | 369.90 | 370.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 1416 | 0.0 | 0.0 | 0.0 |
1987 | 3600 | 0.0 | 0.0 | 0.0 |
1988 | 3936 | 0.0 | 0.0 | 0.0 |
1989 | 8091 | 0.0 | 0.0 | 0.0 |
1990 | 6312 | 0.0 | 0.0 | 0.0 |
1991 | 4128 | 0.0 | 0.0 | 0.0 |
1992 | 8783 | 0.0 | 0.0 | 0.0 |
1993 | 7391 | 0.0 | 0.0 | 0.0 |
1994 | 8646 | 0.0 | 0.0 | 0.0 |
1995 | 7988 | 0.0 | 0.0 | 0.0 |
1996 | 8732 | 0.0 | 0.0 | 0.0 |
1997 | 8745 | 0.0 | 0.0 | 0.0 |
1998 | 8376 | 0.0 | 0.0 | 0.0 |
1999 | 8740 | 0.0 | 0.0 | 0.0 |
2000 | 8782 | 0.0 | 0.0 | 0.0 |
2001 | 8746 | 0.0 | 0.0 | 0.0 |
2002 | 8751 | 0.0 | 0.0 | 0.0 |
2003 | 8748 | 0.0 | 0.0 | 0.0 |
2004 | 8782 | 0.0 | 0.0 | 0.0 |
2005 | 8756 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8727 | 0.0 | 0.0 | 0.0 |
2008 | 8779 | 0.0 | 0.0 | 0.0 |
2009 | 8727 | 0.0 | 0.0 | 0.0 |
2010 | 8753 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 6623 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 6426 | 0.0 | 0.0 | 0.0 |
2015 | 6575 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8706 | 0.0 | 0.0 | 0.0 |
2018 | 8688 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1985-11-24 | Lost Circulation | 23.00 | 68.00 |
For data sources see[6]