If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134060608002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/08-06-013-06W4/2 | |
Location Alias: 00/08-06-13-06 W4M | |
Location Alias 2: 00/08-06-013-06 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 06 | |
Section: 06 | |
County/Municipality: Redcliff | |
Well Name: HOPE MEDHAT 8-6MH-13-6 | |
Operator Name: City Of Medicine Hat | |
License Number: 0066129 | |
License Date: 1977-10-13 | |
License Status: Suspension | |
Spud Date: 1977-10-14 | |
Final Drill Date: 1977-10-15 | |
Well Total Depth: 488.60 m | |
Surface Hole Latitude: 50.054818 | |
Surface Hole Longitude: -110.803767 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-10-13 | Obtained License |
1977-10-15 | Finished Drilling |
1977-10-15 | Production Casing Operation Performed |
1977-10-15 | Well Mode changed to Drilled and Cased |
1977-10-20 | Perforation Treatment Performed - Selective Bullet Perforations |
1977-10-30 | Perforation Treatment Performed - Fractured |
1978-12-18 | Well Began Production |
1978-12-18 | Well Fluid changed to Gas |
1978-12-18 | Well Mode changed to Flowing |
1980-04-15 | Well Fluid changed to Gas |
1980-04-15 | Well Mode changed to Suspended |
2014-02-24 | Perforation Treatment Performed - Jet Perforation |
2014-02-24 | Well Log Performed |
2014-05-23 | Perforation Treatment Performed - Cement Squeeze |
2017-01-24 | Well Log Performed |
2017-03-17 | Perforation Treatment Performed - Jet Perforation |
2017-03-17 | Well Log Performed |
2017-06-07 | Perforation Treatment Performed - Cement Squeeze |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-10-20 | Selective Bullet Perforations | 287.40 | 288.00 | 0 |
1977-10-20 | Selective Bullet Perforations | 358.90 | 380.10 | 0 |
1977-10-20 | Selective Bullet Perforations | 381.90 | 384.00 | 0 |
1977-10-30 | Fracture | 287.40 | 336.80 | 0 |
2014-02-24 | Perforation | 285.50 | 287.50 | 17 |
2014-05-23 | Cement Squeeze | 285.50 | 336.80 | 0 |
2017-03-17 | Perforation | 284.50 | 288.50 | 13 |
2017-06-07 | Cement Squeeze | 284.50 | 288.50 | 0 |
1977-10-20 | Selective Bullet Perforations | 288.60 | 290.50 | 0 |
1977-10-20 | Selective Bullet Perforations | 291.70 | 292.30 | 0 |
1977-10-20 | Selective Bullet Perforations | 294.10 | 296.60 | 0 |
1977-10-20 | Selective Bullet Perforations | 300.50 | 303.00 | 0 |
1977-10-20 | Selective Bullet Perforations | 303.20 | 303.40 | 0 |
1977-10-20 | Selective Bullet Perforations | 305.10 | 306.40 | 0 |
1977-10-20 | Selective Bullet Perforations | 330.40 | 332.80 | 0 |
1977-10-20 | Selective Bullet Perforations | 336.80 | 336.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 295 | 0.0 | 0.0 | 0.0 |
1979 | 1353 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-02-24 | No Incident Encountered | 0.00 | 0.00 |
2017-03-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]