If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0134120606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.052587,"lon":-111.635026,"icon":""}]} |
| Location: 00/06-06-013-12W4/0 | |
| Location Alias: 00/06-06-13-12 W4M | |
| Location Alias 2: 00/06-06-013-12 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 013 | |
| Meridian: 4 | |
| Range: 12 | |
| Section: 06 | |
| County/Municipality: Municipal District of Taber | |
| Well Name: ASHLAND SCURRY RONALANE 6-6-13-12 | |
| Operator Name: BP Canada Energy Group ULC | |
| License Number: 0041798 | |
| License Date: 1971-12-30 | |
| License Status: RecCertified | |
| Spud Date: 1972-01-03 | |
| Final Drill Date: 1972-01-08 | |
| Well Total Depth: 986.60 m | |
| Surface Hole Latitude: 50.052587 | |
| Surface Hole Longitude: -111.635026 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1971-12-30 | Obtained License |
| 1972-01-08 | Finished Drilling |
| 1972-01-08 | Well Mode changed to Drilled and Cased |
| 1972-01-09 | Drill Stem Test Performed |
| 1972-01-11 | Production Casing Operation Performed |
| 1972-01-24 | Perforation Treatment Performed - Jet Perforation |
| 1972-01-27 | Well Began Production |
| 1972-01-27 | Well Fluid changed to Crude Oil |
| 1972-01-27 | Well Mode changed to Flowing |
| 1975-01-31 | Well Fluid changed to Crude Oil |
| 1975-01-31 | Well Mode changed to Suspended |
| 1977-08-29 | Well Fluid changed to Crude Oil |
| 1977-08-29 | Well Mode changed to Pumping |
| 1978-11-10 | Well Fluid changed to Crude Oil |
| 1978-11-10 | Well Mode changed to Suspended |
| 1987-12-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1987-12-06 | Plug Back Performed |
| 1987-12-06 | Well Abandoned |
| 1987-12-06 | Well Fluid changed to Crude Oil |
| 1987-12-06 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1972-01-24 | Perforation | 951.00 | 951.60 | 3 |
| 1987-12-06 | Packing Device Capped w/Cement | 942.00 | 950.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1972 | 3586 | 0.0 | 0.0 | 0.0 |
| 1973 | 2096 | 0.0 | 0.0 | 0.0 |
| 1977 | 456 | 0.0 | 0.0 | 0.0 |
| 1978 | 1946 | 0.0 | 0.0 | 0.0 |
For data sources see[5]