If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134180116000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.060935,"lon":-112.325354,"icon":""}]} |
Location: 00/16-01-013-18W4/0 | |
Location Alias: 00/16-01-13-18 W4M | |
Location Alias 2: 00/16-01-013-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 18 | |
Section: 01 | |
County/Municipality: Municipal District of Taber | |
Well Name: 1473649AB RETLAW 16-1-13-18 | |
Operator Name: Zargon Oil & Gas Ltd. | |
License Number: 0109262 | |
License Date: 1984-09-12 | |
License Status: Abandoned | |
Spud Date: 1984-09-28 | |
Final Drill Date: 1984-10-03 | |
Well Total Depth: 1085.00 m | |
Surface Hole Latitude: 50.060935 | |
Surface Hole Longitude: -112.325354 |
Date | Event |
---|---|
1984-09-12 | Obtained License |
1984-09-29 | Surface Casing Operation Performed |
1984-10-02 | Kick Occurred |
1984-10-03 | Finished Drilling |
1984-10-04 | Well Log Performed |
1984-10-06 | Production Casing Operation Performed |
1984-10-06 | Rig Released |
1984-10-06 | Well Mode changed to Drilled and Cased |
1985-10-13 | Perforation Treatment Performed - Jet Perforation |
1985-10-13 | Well Log Performed |
1986-07-16 | Well Began Production |
1986-07-16 | Well Fluid changed to Gas |
1986-07-16 | Well Mode changed to Flowing |
1987-04-23 | Well Log Performed |
1987-05-01 | Well Fluid changed to Gas |
1987-05-01 | Well Mode changed to Suspended |
2007-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-03-02 | Plug Back Performed |
2007-03-02 | Well Fluid changed to Gas |
2007-03-02 | Well Mode changed to Abandoned Zone |
2007-10-07 | Well Fluid changed to Gas |
2007-10-07 | Well Mode changed to Abandoned |
2008-10-07 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-10-13 | Perforation | 1058.00 | 1059.00 | 13 |
2007-03-02 | Packing Device Capped w/Cement | 1036.00 | 1045.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 993 | 0.0 | 0.0 | 0.0 |
1987 | 590 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1984-10-02 | Kick | 1069.00 | 1069.00 |
For data sources see[6]