X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134182010000

Well Details

Well ID: 0134182010000
Loading map...
Location: 00/10-20-013-18W4/0
Location Alias: 00/10-20-13-18 W4M
Location Alias 2: 00/10-20-013-18 W4/00
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 18
Section: 20
County/Municipality: Municipal District of Taber
Well Name: SPHERE RETLAW 10-20-13-18
Operator Name: Sphere Energy Corp.
License Number: 0323040
License Date: 2004-12-29
License Status: RecCertified
Spud Date: 2005-01-06
Final Drill Date: 2005-01-10
Well Total Depth: 1170.00 m
Surface Hole Latitude: 50.100378
Surface Hole Longitude: -112.426041

For data sources see[1][2]

Well History

Date Event
2004-12-29 Obtained License
2005-01-08 Surface Casing Operation Performed
2005-01-10 Finished Drilling
2005-01-10 Well Log Performed
2005-01-10 Well Mode changed to Drilled and Cased
2005-01-11 Well Log Performed
2005-01-12 Production Casing Operation Performed
2005-01-12 Rig Released
2005-02-07 Well Log Performed
2005-02-08 Perforation Treatment Performed - Jet Perforation
2005-02-08 Well Log Performed
2005-10-29 Well Began Production
2005-10-29 Well Fluid changed to Gas
2005-10-29 Well Mode changed to Flowing
2006-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-05-18 Plug Back Performed
2006-05-18 Well Fluid changed to Gas
2006-05-18 Well Mode changed to Abandoned Zone
2006-05-19 Perforation Treatment Performed - Jet Perforation
2006-07-11 Perforation Treatment Performed - Fractured
2010-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-04 Plug Back Performed
2010-11-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-08 Perforation 1124.70 1125.20 17
2006-05-18 Packing Device Capped w/Cement 1105.00 1120.00 0
2006-05-19 Perforation 960.00 962.00 13
2006-07-11 Fracture 960.00 962.00 0
2010-11-04 Packing Device Capped w/Cement 946.00 954.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1525 0.0 0.0 0.0
2006 1868 0.0 0.0 0.0

For data sources see[5]

References