If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134200715002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.073731,"lon":-112.719123,"icon":""}]} |
Location: 00/15-07-013-20W4/2 | |
Location Alias: 00/15-07-13-20 W4M | |
Location Alias 2: 00/15-07-013-20 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 20 | |
Section: 07 | |
County/Municipality: Lethbridge County | |
Well Name: CPEC CARM 15-7-13-20 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0259584 | |
License Date: 2001-09-17 | |
License Status: Issued | |
Spud Date: 2001-11-06 | |
Final Drill Date: 2001-11-10 | |
Well Total Depth: 1315.00 m | |
Surface Hole Latitude: 50.073731 | |
Surface Hole Longitude: -112.719123 |
Date | Event |
---|---|
2001-09-17 | Obtained License |
2001-11-06 | Lost Circulation Occurred |
2001-11-08 | Surface Casing Operation Performed |
2001-11-10 | Finished Drilling |
2001-11-10 | Well Log Performed |
2001-11-10 | Well Mode changed to Drilled and Cased |
2001-11-11 | Production Casing Operation Performed |
2001-11-11 | Rig Released |
2001-11-11 | Well Log Performed |
2002-01-08 | Perforation Treatment Performed - Jet Perforation |
2002-01-08 | Well Log Performed |
2002-01-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-01-17 | Perforation Treatment Performed - Jet Perforation |
2002-01-17 | Plug Back Performed |
2002-01-17 | Well Log Performed |
2002-01-23 | Well Fluid changed to Crude Oil |
2002-01-23 | Well Log Performed |
2002-01-23 | Well Mode changed to Potential |
2002-01-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-01-24 | Plug Back Performed |
2002-01-24 | Well Fluid changed to Crude Oil |
2002-01-24 | Well Mode changed to Abandoned Zone |
2002-01-25 | Perforation Treatment Performed - Jet Perforation |
2002-01-25 | Well Log Performed |
2002-02-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-02 | Perforation Treatment Performed - Jet Perforation |
2002-02-02 | Plug Back Performed |
2002-02-02 | Well Log Performed |
2002-02-26 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-01-08 | Perforation | 1285.00 | 1287.00 | 17 |
2002-01-17 | Packing Device Capped w/Cement | 1281.00 | 1284.00 | 0 |
2002-01-17 | Perforation | 1271.00 | 1275.00 | 17 |
2002-01-24 | Packing Device Capped w/Cement | 1257.00 | 1265.00 | 0 |
2002-01-25 | Perforation | 978.00 | 980.00 | 17 |
2002-02-02 | Packing Device Capped w/Cement | 971.00 | 974.00 | 0 |
2002-02-02 | Perforation | 961.00 | 962.00 | 17 |
2002-02-26 | Fracture | 961.00 | 962.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 21 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2001-11-06 | Lost Circulation | 0.10 | 89.00 |
For data sources see[6]