If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0134253606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.125283,"lon":-113.292052,"icon":""}]} |
Location: 00/06-36-013-25W4/0 | |
Location Alias: 00/06-36-13-25 W4M | |
Location Alias 2: 00/06-36-013-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 4 | |
Range: 25 | |
Section: 36 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: PIONEER CANADA ETAL CARM 6-36-13-25 | |
Operator Name: TAQA North Ltd. | |
License Number: 0081100 | |
License Date: 1980-02-14 | |
License Status: Re-Entered | |
Spud Date: 1980-02-20 | |
Final Drill Date: 1980-03-24 | |
Well Total Depth: 2222.30 m | |
Surface Hole Latitude: 50.125283 | |
Surface Hole Longitude: -113.292052 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-02-14 | Obtained License |
1980-03-08 | Well Log Performed |
1980-03-09 | Drill Stem Test Performed |
1980-03-11 | Drill Stem Test Performed |
1980-03-19 | Water Flow Occurred |
1980-03-20 | Drill Stem Test Performed |
1980-03-24 | Finished Drilling |
1980-03-24 | Well Log Performed |
1980-03-24 | Well Mode changed to Drilled and Cased |
1980-03-26 | Production Casing Operation Performed |
1980-04-07 | Perforation Treatment Performed - Open-Hole Completion |
1980-04-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-04-26 | Well Began Production |
1980-04-26 | Well Fluid changed to Crude Oil |
1980-04-26 | Well Mode changed to Pumping |
1980-05-31 | Well Fluid changed to Crude Oil |
1980-05-31 | Well Mode changed to Suspended |
1980-06-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-09-27 | Perforation Treatment Performed - Jet Perforation |
1980-09-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-10-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-05-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-05-07 | Well Fluid changed to Crude Oil |
1982-05-07 | Well Mode changed to Abandoned Zone |
1982-05-08 | Perforation Treatment Performed - Jet Perforation |
1982-05-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-10-07 | Perforation Treatment Performed - Fractured |
1983-01-12 | Perforation Treatment Performed - Fractured |
1993-12-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-12-24 | Plug Back Performed |
1993-12-24 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-04-07 | Open Hole/Barefoot Completion | 2208.10 | 2222.30 | 0 |
1980-10-01 | Acid Treatment | 2164.00 | 2169.00 | 0 |
1980-10-02 | Acid Treatment | 2150.00 | 2160.00 | 0 |
1980-10-03 | Acid Treatment | 2111.00 | 2113.00 | 0 |
1982-05-07 | Packing Device Capped w/Cement | 2023.00 | 2031.00 | 0 |
1982-05-08 | Perforation | 1779.50 | 1782.50 | 13 |
1982-05-09 | Acid Treatment | 1779.50 | 1782.50 | 0 |
1982-10-07 | Fracture | 1779.50 | 1782.50 | 0 |
1983-01-12 | Fracture | 1779.50 | 1782.50 | 0 |
1993-12-24 | Packing Device Capped w/Cement | 1765.00 | 1773.00 | 0 |
1980-04-11 | Acid Treatment | 2208.10 | 2222.30 | 0 |
1980-06-28 | Acid Treatment | 2208.10 | 2222.30 | 0 |
1980-09-27 | Perforation | 2179.00 | 2183.00 | 7 |
1980-09-27 | Perforation | 2164.00 | 2169.00 | 7 |
1980-09-27 | Perforation | 2150.00 | 2160.00 | 4 |
1980-09-27 | Perforation | 2111.00 | 2113.00 | 7 |
1980-09-27 | Perforation | 2057.00 | 2059.00 | 7 |
1980-09-29 | Acid Treatment | 2179.00 | 2183.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 780 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-03-19 | Water Flow | 2178.00 | 0.00 |
For data sources see[6]