X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0134262016003

Well Details

Well ID: 0134262016003
Loading map...
Location: 00/16-20-013-26W4/3
Location Alias: 00/16-20-13-26 W4M
Location Alias 2: 00/16-20-013-26 W4/03
Country: Canada
Province: Alberta
Township: 013
Meridian: 4
Range: 26
Section: 20
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: LTAM CLARES 16-20-13-26
Operator Name: Long Term Asset Management Inc.
License Number: 0084565
License Date: 1980-07-30
License Status: Issued
Spud Date: 1980-08-24
Final Drill Date: 1980-09-22
Well Total Depth: 2182.00 m
Surface Hole Latitude: 50.103452
Surface Hole Longitude: -113.509406

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-30 Obtained License
1980-09-18 Drill Stem Test Performed
1980-09-22 Finished Drilling
1980-09-22 Well Mode changed to Drilled and Cased
1980-09-23 Drill Stem Test Performed
1980-09-24 Drill Stem Test Performed
1980-09-25 Drill Stem Test Performed
1980-09-28 Production Casing Operation Performed
1980-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-16 Perforation Treatment Performed - Jet Perforation
1980-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-25 Perforation Treatment Performed - Jet Perforation
1982-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-03-20 Perforation Treatment Performed - Jet Perforation
1982-03-21 Perforation Treatment Performed - Acid Wash - No Pressure
1982-03-24 Perforation Treatment Performed - Fractured
2006-06-06 Perforation Treatment Performed - Jet Perforation
2006-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-06-17 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-16 Perforation 2133.00 2134.00 7
2006-06-06 Perforation 1800.50 1804.00 17
2006-06-14 Acid Treatment 1800.50 1804.00 0
2006-06-17 Cement Squeeze 1800.50 1804.00 0
1980-10-16 Perforation 2136.00 2138.00 7
1980-10-16 Acid Treatment 2133.00 2138.00 0
1980-10-29 Acid Treatment 2133.00 2138.00 0
1981-02-25 Perforation 2065.50 2070.00 7
1982-03-20 Packing Device Capped w/Cement 2042.00 2050.00 0
1982-03-20 Perforation 2027.50 2030.00 13
1982-03-21 Acid Wash 2027.50 2030.00 0
1982-03-24 Fracture 2027.50 2030.00 0

For data sources see[4]



References