If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0135042613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.120478,"lon":-114.459082,"icon":""}]} |
Location: 00/13-26-013-04W5/0 | |
Location Alias: 00/13-26-13-04 W5M | |
Location Alias 2: 00/13-26-013-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 013 | |
Meridian: 5 | |
Range: 04 | |
Section: 26 | |
County/Municipality: Municipal District of Ranchland No. 66 | |
Well Name: HUSKY SAVANNA CREEK 13-26-13-4 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0163501 | |
License Date: 1993-12-23 | |
License Status: RecCertified | |
Spud Date: 1994-01-27 | |
Final Drill Date: 1994-06-06 | |
Well Total Depth: 3681.00 m | |
Surface Hole Latitude: 50.120478 | |
Surface Hole Longitude: -114.459082 |
Date | Event |
---|---|
1993-12-23 | Obtained License |
1994-01-28 | Lost Circulation Occurred |
1994-02-12 | Surface Casing Operation Performed |
1994-02-15 | Direction Drilling Operation Performed - Deviate |
1994-06-06 | Finished Drilling |
1994-06-08 | Well Log Performed |
1994-06-09 | Well Log Performed |
1994-06-28 | Lost Circulation Occurred |
1994-06-28 | Perforation Treatment Performed - Open-Hole Completion |
1994-06-28 | Production Casing Operation Performed |
1994-06-30 | Rig Released |
1994-06-30 | Well Mode changed to Drilled and Cased |
1994-07-05 | Well Log Performed |
1994-07-15 | Well Log Performed |
1994-07-19 | Well Log Performed |
1994-07-21 | Well Log Performed |
1994-07-25 | Liner Casing Operation Performed |
1994-08-03 | Well Log Performed |
1994-08-04 | Well Log Performed |
1994-08-05 | Perforation Treatment Performed - Jet Perforation |
1994-08-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-08-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-08-30 | Well Log Performed |
1994-08-31 | Perforation Treatment Performed - Jet Perforation |
1994-08-31 | Well Log Performed |
1994-09-01 | Perforation Treatment Performed - Acid Wash - No Pressure |
1994-09-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-09-06 | Perforation Treatment Performed - Jet Perforation |
1994-09-06 | Well Log Performed |
1994-09-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-09-07 | Perforation Treatment Performed - Jet Perforation |
1994-09-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-09-15 | Perforation Treatment Performed - Jet Perforation |
1994-09-15 | Well Log Performed |
1994-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-09-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-09-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-09-29 | Well Log Performed |
1994-09-30 | Perforation Treatment Performed - Jet Perforation |
1994-10-04 | Perforation Treatment Performed - Fractured |
1994-10-09 | Well Log Performed |
1994-10-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-10 | Plug Back Performed |
1994-10-10 | Well Mode changed to Abandoned Zone |
2003-02-21 | Well Log Performed |
2003-02-25 | Well Log Performed |
2003-03-04 | Perforation Treatment Performed - Jet Perforation |
2003-03-04 | Well Log Performed |
2003-03-10 | Well Log Performed |
2003-03-14 | Perforation Treatment Performed - Remedial Casing |
2003-03-17 | Well Abandoned |
2003-03-17 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-02-15 | 448.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-06-28 | Open Hole/Barefoot Completion | 2903.50 | 3681.00 | 0 |
1994-08-31 | Perforation | 3511.00 | 3516.00 | 13 |
1994-09-01 | Acid Wash | 3472.00 | 3516.00 | 0 |
1994-09-02 | Acid Treatment | 3472.00 | 3516.00 | 0 |
1994-09-06 | Perforation | 3388.00 | 3394.00 | 13 |
1994-09-06 | Perforation | 3400.00 | 3402.50 | 13 |
1994-09-07 | Perforation | 3350.00 | 3356.00 | 13 |
1994-09-07 | Perforation | 3382.00 | 3394.00 | 13 |
1994-09-07 | Acid Treatment | 3382.00 | 3402.50 | 0 |
1994-09-11 | Acid Treatment | 3350.00 | 3356.00 | 0 |
1994-09-15 | Perforation | 3288.00 | 3293.00 | 13 |
1994-08-05 | Perforation | 3525.40 | 3534.40 | 32 |
1994-09-16 | Acid Treatment | 3288.00 | 3293.00 | 0 |
1994-09-17 | Acid Treatment | 3288.00 | 3293.00 | 0 |
1994-09-23 | Acid Treatment | 3288.00 | 3293.00 | 0 |
1994-09-30 | Perforation | 3065.00 | 3076.00 | 13 |
1994-10-04 | Fracture | 3065.00 | 3076.00 | 0 |
1994-10-10 | Packing Device Capped w/Cement | 3327.00 | 3335.00 | 0 |
1994-10-10 | Packing Device Capped w/Cement | 3262.00 | 3270.00 | 0 |
1994-10-10 | Packing Device Capped w/Cement | 3042.00 | 3050.00 | 0 |
2003-03-04 | Perforation | 552.00 | 552.30 | 13 |
2003-03-14 | Remedial Casing Cementing | 552.00 | 552.30 | 0 |
1994-08-05 | Perforation | 3565.00 | 3570.00 | 32 |
1994-08-06 | Acid Treatment | 3525.40 | 3570.00 | 0 |
1994-08-10 | Acid Treatment | 3525.40 | 3570.00 | 0 |
1994-08-31 | Perforation | 3472.00 | 3477.00 | 13 |
1994-08-31 | Perforation | 3479.00 | 3486.00 | 13 |
1994-08-31 | Perforation | 3490.00 | 3493.00 | 13 |
1994-08-31 | Perforation | 3496.00 | 3505.00 | 13 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1994-01-28 | Lost Circulation | 36.00 | 439.00 |
1994-06-28 | Lost Circulation | 3681.00 | 3681.00 |
For data sources see[6]