If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144042412000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.187508,"lon":-110.431776,"icon":""}]} |
Location: 00/12-24-014-04W4/0 | |
Location Alias: 00/12-24-14-04 W4M | |
Location Alias 2: 00/12-24-014-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 04 | |
Section: 24 | |
County/Municipality: Cypress County | |
Well Name: QUESTFIRE MEDHAT 12-24-14-4 | |
Operator Name: Questfire Energy Corp. | |
License Number: 0077146 | |
License Date: 1979-07-27 | |
License Status: Issued | |
Spud Date: 1979-09-02 | |
Final Drill Date: 1979-09-04 | |
Well Total Depth: 791.00 m | |
Surface Hole Latitude: 50.187508 | |
Surface Hole Longitude: -110.431776 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-07-27 | Obtained License |
1979-09-04 | Finished Drilling |
1979-09-04 | Production Casing Operation Performed |
1979-09-04 | Well Mode changed to Drilled and Cased |
1979-09-21 | Perforation Treatment Performed - Bullet Perforation |
1979-10-05 | Perforation Treatment Performed - Selective Bullet Perforations |
1979-10-11 | Perforation Treatment Performed - Fractured |
1979-10-27 | Perforation Treatment Performed - Selective Bullet Perforations |
1979-11-02 | Perforation Treatment Performed - Fractured |
1979-11-16 | Well Began Production |
1979-11-16 | Well Fluid changed to Gas |
1979-11-16 | Well Mode changed to Flowing |
1986-11-25 | Well Fluid changed to Gas |
1986-11-25 | Well Mode changed to Suspended |
1987-03-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-03-11 | Plug Back Performed |
1987-03-11 | Well Fluid changed to Gas |
1987-03-11 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-09-21 | Bullet Perforation | 712.50 | 713.60 | 20 |
1979-10-05 | Selective Bullet Perforations | 456.50 | 457.50 | 0 |
1979-10-05 | Selective Bullet Perforations | 458.50 | 459.50 | 0 |
1979-10-05 | Selective Bullet Perforations | 460.50 | 461.50 | 0 |
1979-10-05 | Selective Bullet Perforations | 462.50 | 463.50 | 0 |
1979-10-05 | Selective Bullet Perforations | 464.50 | 473.50 | 0 |
1979-10-05 | Selective Bullet Perforations | 484.00 | 484.00 | 0 |
1979-10-11 | Fracture | 432.50 | 484.00 | 0 |
1979-10-27 | Selective Bullet Perforations | 324.50 | 333.00 | 0 |
1979-10-27 | Selective Bullet Perforations | 336.00 | 337.50 | 0 |
1979-10-27 | Selective Bullet Perforations | 339.00 | 340.00 | 0 |
1979-09-21 | Bullet Perforation | 713.70 | 714.20 | 40 |
1979-10-27 | Selective Bullet Perforations | 343.00 | 344.50 | 0 |
1979-10-27 | Selective Bullet Perforations | 346.50 | 354.00 | 0 |
1979-10-27 | Selective Bullet Perforations | 357.50 | 360.00 | 0 |
1979-10-27 | Selective Bullet Perforations | 367.50 | 368.50 | 0 |
1979-10-27 | Selective Bullet Perforations | 369.50 | 371.00 | 0 |
1979-10-27 | Selective Bullet Perforations | 372.50 | 374.00 | 0 |
1979-10-27 | Selective Bullet Perforations | 375.50 | 385.00 | 0 |
1979-10-27 | Selective Bullet Perforations | 386.50 | 388.00 | 0 |
1979-11-02 | Fracture | 324.50 | 388.00 | 0 |
1987-03-11 | Packing Device Capped w/Cement | 687.00 | 695.00 | 0 |
1979-09-21 | Bullet Perforation | 714.20 | 715.00 | 7 |
1979-10-05 | Selective Bullet Perforations | 432.50 | 433.00 | 0 |
1979-10-05 | Selective Bullet Perforations | 433.50 | 434.00 | 0 |
1979-10-05 | Selective Bullet Perforations | 434.50 | 435.00 | 0 |
1979-10-05 | Selective Bullet Perforations | 435.50 | 436.00 | 0 |
1979-10-05 | Selective Bullet Perforations | 436.50 | 438.00 | 0 |
1979-10-05 | Selective Bullet Perforations | 439.00 | 442.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 1104 | 0.0 | 0.0 | 0.0 |
1980 | 7200 | 0.0 | 0.0 | 0.0 |
1981 | 8759 | 0.0 | 0.0 | 0.0 |
1982 | 8736 | 0.0 | 0.0 | 0.0 |
1983 | 8329 | 0.0 | 0.0 | 0.0 |
1984 | 5336 | 0.0 | 0.0 | 0.0 |
1985 | 4862 | 0.0 | 0.0 | 0.0 |
For data sources see[5]