X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144151708002

Well Details

Well ID: 0144151708002
Loading map...
Location: 00/08-17-014-15W4/2
Location Alias: 00/08-17-14-15 W4M
Location Alias 2: 00/08-17-014-15 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 15
Section: 17
County/Municipality: Municipal District of Taber
Well Name: TAC ENCHANT 8-17-14-15
Operator Name: Tamarack Acquisition Corp.
License Number: 0153891
License Date: 1992-09-30
License Status: Suspension
Spud Date: 1992-11-04
Final Drill Date: 1992-11-13
Well Total Depth: 1415.00 m
Surface Hole Latitude: 50.168417
Surface Hole Longitude: -112.007291

For data sources see[1][2]

Well History

Date Event
1992-09-30 Obtained License
1992-11-05 Surface Casing Operation Performed
1992-11-13 Finished Drilling
1992-11-13 Well Log Performed
1992-11-13 Well Mode changed to Drilled and Cased
1992-11-14 Production Casing Operation Performed
1992-11-15 Rig Released
1992-11-15 Well Log Performed
1992-11-24 Well Log Performed
1992-11-27 Perforation Treatment Performed - Jet Perforation
1992-11-27 Well Log Performed
1992-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-17 Perforation Treatment Performed - Jet Perforation
2001-01-01 Well Log Performed
2001-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-21 Perforation Treatment Performed - Jet Perforation
2001-01-21 Plug Back Performed
2001-01-21 Well Log Performed
2001-02-02 Well Began Production
2001-02-02 Well Fluid changed to Gas
2001-02-02 Well Mode changed to Flowing
2001-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-09 Plug Back Performed
2001-05-04 Perforation Treatment Performed - Fractured
2007-09-01 Well Fluid changed to Gas
2007-09-01 Well Mode changed to Pumping
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-11-27 Perforation 987.50 991.50 13
1992-11-29 Acid Treatment 987.50 991.50 0
1993-06-17 Perforation 977.00 986.50 17
2001-01-21 Packing Device Capped w/Cement 962.00 970.00 0
2001-01-21 Perforation 868.00 875.00 17
2001-03-09 Packing Device Capped w/Cement 954.00 962.00 0
2001-05-04 Fracture 868.00 875.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 6450 0.0 0.0 0.0
2002 8438 0.0 0.0 0.0
2003 7827 0.0 0.0 0.0
2004 8775 0.0 0.0 0.0
2005 8757 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8567 0.0 0.0 0.0
2008 8612 0.0 0.0 0.0
2009 8487 0.0 0.0 0.0
2010 8427 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 2881 0.0 0.0 0.0

For data sources see[5]

References