X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144181814000

Well Details

Well ID: 0144181814000
Loading map...
Location: 00/14-18-014-18W4/0
Location Alias: 00/14-18-14-18 W4M
Location Alias 2: 00/14-18-014-18 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 18
Section: 18
County/Municipality: Municipal District of Taber
Well Name: ZARGON RETLAW 14-18-14-18
Operator Name: Zargon Oil & Gas Ltd.
License Number: 0145402
License Date: 1990-09-14
License Status: Suspension
Spud Date: 1990-09-22
Final Drill Date: 1990-09-28
Well Total Depth: 1180.00 m
Surface Hole Latitude: 50.179257
Surface Hole Longitude: -112.455001

For data sources see[1][2]

Well History

Date Event
1990-09-14 Obtained License
1990-09-23 Surface Casing Operation Performed
1990-09-25 Direction Drilling Operation Performed - Deviate
1990-09-26 Well Log Performed
1990-09-28 Finished Drilling
1990-09-28 Well Log Performed
1990-09-29 Drill Stem Test Performed
1990-09-30 Production Casing Operation Performed
1990-09-30 Rig Released
1990-09-30 Well Mode changed to Drilled and Cased
1997-03-13 Perforation Treatment Performed - Jet Perforation
1997-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-20 Plug Back Performed
1997-10-20 Well Log Performed
1997-10-21 Perforation Treatment Performed - Jet Perforation
1997-10-21 Well Log Performed
1997-10-23 Perforation Treatment Performed - Fractured
1997-11-01 Well Began Production
1997-11-01 Well Fluid changed to Gas
1997-11-01 Well Mode changed to Flowing
2008-01-01 Well Fluid changed to Crude Oil
2008-01-01 Well Mode changed to Pumping
2011-07-01 Well Fluid changed to Crude Oil
2011-07-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-09-25 871.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-03-13 Perforation 1139.50 1141.00 13
1997-03-13 Perforation 1148.00 1149.50 13
1997-10-20 Packing Device Capped w/Cement 1127.00 1135.00 0
1997-10-21 Perforation 1112.00 1119.50 18
1997-10-23 Fracture 1112.00 1119.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1464 0.0 0.0 0.0
1998 6359 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 6855 0.0 0.0 0.0
2001 1373 0.0 0.0 0.0
2002 1932 0.0 0.0 0.0
2003 5687 0.0 0.0 0.0
2004 8663 0.0 0.0 0.0
2005 8586 0.0 0.0 0.0
2006 8119 0.0 0.0 0.0
2007 8123 0.0 0.0 0.0
2008 8771 0.0 0.0 0.0
2009 5444 0.0 0.0 0.0
2010 6671 0.0 0.0 0.0
2011 1872 0.0 0.0 0.0

For data sources see[6]

References