If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0144183512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.218784,"lon":-112.368961,"icon":""}]} |
| Location: 00/12-35-014-18W4/0 | |
| Location Alias: 00/12-35-14-18 W4M | |
| Location Alias 2: 00/12-35-014-18 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 014 | |
| Meridian: 4 | |
| Range: 18 | |
| Section: 35 | |
| County/Municipality: Municipal District of Taber | |
| Well Name: PCP LITTLE BOW 12-35-14-18 | |
| Operator Name: Delta Consultants (1973) Ltd. | |
| License Number: 0095543 | |
| License Date: 1982-03-12 | |
| License Status: RecCertified | |
| Spud Date: 1982-03-15 | |
| Final Drill Date: 1982-03-20 | |
| Well Total Depth: 1112.00 m | |
| Surface Hole Latitude: 50.218784 | |
| Surface Hole Longitude: -112.368961 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1982-03-12 | Obtained License |
| 1982-03-20 | Finished Drilling |
| 1982-03-20 | Kick Occurred |
| 1982-03-20 | Well Mode changed to Drilled and Cased |
| 1982-03-22 | Drill Stem Test Performed |
| 1982-03-23 | Production Casing Operation Performed |
| 1982-06-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1982-06-11 | Perforation Treatment Performed - Cement Squeeze |
| 1982-06-11 | Perforation Treatment Performed - Jet Perforation |
| 1982-06-18 | Perforation Treatment Performed - Jet Perforation |
| 1982-10-07 | Well Began Production |
| 1982-10-07 | Well Fluid changed to Crude Oil |
| 1982-10-07 | Well Mode changed to Pumping |
| 1983-03-01 | Well Fluid changed to Crude Oil |
| 1983-03-01 | Well Mode changed to Suspended |
| 1984-12-19 | Perforation Treatment Performed - Jet Perforation |
| 1985-01-01 | Well Fluid changed to Crude Oil |
| 1985-01-01 | Well Mode changed to Pumping |
| 1985-02-28 | Well Fluid changed to Crude Oil |
| 1985-02-28 | Well Mode changed to Suspended |
| 1985-10-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1985-10-27 | Plug Back Performed |
| 1985-10-27 | Well Abandoned |
| 1985-10-27 | Well Fluid changed to Crude Oil |
| 1985-10-27 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1982-06-11 | Perforation | 1076.50 | 1076.80 | 13 |
| 1982-06-11 | Acid Treatment | 1076.50 | 1076.80 | 0 |
| 1982-06-11 | Cement Squeeze | 1076.50 | 1076.80 | 0 |
| 1982-06-18 | Perforation | 1071.80 | 1073.80 | 13 |
| 1984-12-19 | Perforation | 1072.60 | 1073.60 | 13 |
| 1985-10-27 | Packing Device Capped w/Cement | 1052.00 | 1060.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1982 | 1426 | 0.0 | 0.0 | 0.0 |
| 1985 | 1416 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1982-03-20 | Kick | 1086.00 | 1086.00 |
For data sources see[6]