X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144191414022

Well Details

Well ID: 0144191414022
Loading map...
Location: 02/14-14-014-19W4/2
Location Alias: 02/14-14-14-19 W4M
Location Alias 2: 02/14-14-014-19 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 19
Section: 14
County/Municipality: Municipal District of Taber
Well Name: DAYLIGHT ET AL LBOW 14-14-14-19
Operator Name: Sphere Energy Corp.
License Number: 0190458
License Date: 1996-08-14
License Status: Issued
Spud Date: 1996-08-22
Final Drill Date: 1996-08-27
Well Total Depth: 1190.00 m
Surface Hole Latitude: 50.177426
Surface Hole Longitude: -112.498663

For data sources see[1][2]

Well History

Date Event
1996-08-14 Obtained License
1996-08-23 Surface Casing Operation Performed
1996-08-27 Finished Drilling
1996-08-27 Well Log Performed
1996-08-27 Well Mode changed to Drilled and Cased
1996-08-28 Production Casing Operation Performed
1996-08-28 Rig Released
1996-09-05 Well Log Performed
1996-09-07 Perforation Treatment Performed - Jet Perforation
1996-09-07 Well Log Performed
1996-09-08 Perforation Treatment Performed - Cement Plug
1996-09-09 Perforation Treatment Performed - Jet Perforation
1996-09-09 Well Log Performed
2006-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-13 Perforation Treatment Performed - Jet Perforation
2006-12-13 Plug Back Performed
2006-12-13 Well Log Performed
2006-12-16 Perforation Treatment Performed - Fractured
2007-02-12 Well Began Production
2007-02-12 Well Fluid changed to Gas
2007-02-12 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-09-07 Perforation 1153.70 1155.20 13
1996-09-08 Cement Plug 1145.00 1150.00 0
1996-09-09 Perforation 1124.00 1125.50 13
2006-12-13 Packing Device Capped w/Cement 1112.00 1120.00 0
2006-12-13 Packing Device Capped w/Cement 872.00 880.00 0
2006-12-13 Perforation 778.50 781.50 13
2006-12-16 Fracture 778.50 781.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 7720 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 6461 0.0 0.0 0.0
2010 6737 0.0 0.0 0.0
2011 8583 0.0 0.0 0.0
2012 1832 0.0 0.0 0.0
2013 8089 0.0 0.0 0.0
2014 8742 0.0 0.0 0.0
2015 7711 0.0 0.0 0.0
2016 5736 0.0 0.0 0.0
2017 8468 0.0 0.0 0.0
2018 7807 0.0 0.0 0.0
2019 8315 0.0 0.0 0.0
2020 1916 0.0 0.0 0.0

For data sources see[5]

References