If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144191416002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.177287,"lon":-112.489682,"icon":""}]} |
Location: 00/16-14-014-19W4/2 | |
Location Alias: 00/16-14-14-19 W4M | |
Location Alias 2: 00/16-14-014-19 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 19 | |
Section: 14 | |
County/Municipality: Municipal District of Taber | |
Well Name: SPHERE RETLAW 16-14-14-19 | |
Operator Name: Sphere Energy Corp. | |
License Number: 0187218 | |
License Date: 1996-04-16 | |
License Status: Issued | |
Spud Date: 1996-04-24 | |
Final Drill Date: 1996-04-28 | |
Well Total Depth: 1160.00 m | |
Surface Hole Latitude: 50.177287 | |
Surface Hole Longitude: -112.489682 |
Date | Event |
---|---|
1996-04-16 | Obtained License |
1996-04-24 | Well Log Performed |
1996-04-25 | Surface Casing Operation Performed |
1996-04-28 | Finished Drilling |
1996-04-28 | Well Log Performed |
1996-04-28 | Well Mode changed to Drilled and Cased |
1996-04-29 | Production Casing Operation Performed |
1996-04-29 | Rig Released |
1996-05-06 | Well Log Performed |
1996-05-08 | Perforation Treatment Performed - Jet Perforation |
1996-05-12 | Perforation Treatment Performed - Fractured |
2006-12-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-12-15 | Perforation Treatment Performed - Jet Perforation |
2006-12-15 | Plug Back Performed |
2006-12-15 | Well Log Performed |
2006-12-19 | Perforation Treatment Performed - Fractured |
2007-02-12 | Well Began Production |
2007-02-12 | Well Fluid changed to Gas |
2007-02-12 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-05-08 | Perforation | 1126.50 | 1129.00 | 13 |
1996-05-08 | Perforation | 1130.00 | 1131.00 | 13 |
1996-05-12 | Fracture | 1126.50 | 1131.00 | 0 |
2006-12-15 | Packing Device Capped w/Cement | 1112.00 | 1120.00 | 0 |
2006-12-15 | Perforation | 777.00 | 780.00 | 13 |
2006-12-19 | Fracture | 777.00 | 780.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 7720 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 6461 | 0.0 | 0.0 | 0.0 |
2010 | 6737 | 0.0 | 0.0 | 0.0 |
2011 | 8583 | 0.0 | 0.0 | 0.0 |
2012 | 1832 | 0.0 | 0.0 | 0.0 |
2013 | 8089 | 0.0 | 0.0 | 0.0 |
2014 | 8742 | 0.0 | 0.0 | 0.0 |
2015 | 7711 | 0.0 | 0.0 | 0.0 |
2016 | 5736 | 0.0 | 0.0 | 0.0 |
2017 | 8468 | 0.0 | 0.0 | 0.0 |
2018 | 7807 | 0.0 | 0.0 | 0.0 |
2019 | 8315 | 0.0 | 0.0 | 0.0 |
2020 | 1916 | 0.0 | 0.0 | 0.0 |
For data sources see[5]