X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144192303002

Well Details

Well ID: 0144192303002
Loading map...
Location: 00/03-23-014-19W4/2
Location Alias: 00/03-23-14-19 W4M
Location Alias 2: 00/03-23-014-19 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 19
Section: 23
County/Municipality: Municipal District of Taber
Well Name: SPHERE LBOW 3-23-14-19
Operator Name: Sphere Energy Corp.
License Number: 0317181
License Date: 2004-10-21
License Status: RecCertified
Spud Date: 2004-10-31
Final Drill Date: 2004-10-31
Well Total Depth: 1191.00 m
Surface Hole Latitude: 50.181750
Surface Hole Longitude: -112.500677

For data sources see[1][2]

Well History

Date Event
2004-10-21 Obtained License
2004-10-31 Finished Drilling
2004-10-31 Perforation Treatment Performed - Jet Perforation
2004-10-31 Rig Released
2004-10-31 Well Mode changed to Drilled and Cased
2004-11-19 Perforation Treatment Performed - Fractured
2005-08-20 Well Began Production
2005-08-20 Well Fluid changed to Gas
2005-08-20 Well Mode changed to Flowing
2006-01-13 Perforation Treatment Performed - Jet Perforation
2006-01-13 Well Log Performed
2006-01-23 Perforation Treatment Performed - Fractured
2007-10-13 Well Log Performed
2007-10-14 Well Log Performed
2008-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-07 Plug Back Performed
2008-10-07 Well Fluid changed to Gas
2008-10-07 Well Mode changed to Abandoned Zone
2008-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-08 Plug Back Performed
2008-10-08 Well Log Performed
2008-11-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-10-31 Perforation 780.00 783.00 13
2004-11-19 Fracture 780.00 783.00 0
2006-01-13 Perforation 313.00 318.00 13
2006-01-23 Fracture 313.00 318.00 0
2008-10-07 Packing Device Capped w/Cement 767.00 775.00 0
2008-10-08 Packing Device Capped w/Cement 300.00 308.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 2969 0.0 0.0 0.0
2006 7223 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 5855 0.0 0.0 0.0

For data sources see[5]

References