X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144193305000

Well Details

Well ID: 0144193305000
Loading map...
Location: 00/05-33-014-19W4/0
Location Alias: 00/05-33-14-19 W4M
Location Alias 2: 00/05-33-014-19 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 19
Section: 33
County/Municipality: Vulcan County
Well Name: SLE LBOW 5-33-14-19
Operator Name: SanLing Energy Ltd.
License Number: 0056102
License Date: 1975-12-05
License Status: Suspension
Spud Date: 1975-12-06
Final Drill Date: 1975-12-12
Well Total Depth: 1204.00 m
Surface Hole Latitude: 50.213287
Surface Hole Longitude: -112.549169

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-12-05 Obtained License
1975-12-12 Finished Drilling
1975-12-12 Well Mode changed to Drilled and Cased
1975-12-14 Production Casing Operation Performed
1975-12-18 Perforation Treatment Performed - Jet Perforation
1975-12-20 Well Began Production
1975-12-20 Well Fluid changed to Crude Oil
1975-12-20 Well Mode changed to Flowing
1978-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-09-08 Perforation Treatment Performed - Jet Perforation
1978-09-08 Well Fluid changed to Crude Oil
1978-09-08 Well Mode changed to Abandoned Zone
1984-03-03 Well Log Performed
1984-03-28 Perforation Treatment Performed - Cement Squeeze
1984-03-28 Plug Back Performed
1984-03-28 Well Fluid changed to Crude Oil
1984-03-28 Well Mode changed to Flowing
1984-03-29 Perforation Treatment Performed - Jet Perforation
1984-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-30 Perforation Treatment Performed - Cement Squeeze
1984-04-03 Perforation Treatment Performed - Jet Perforation
1985-12-08 Perforation Treatment Performed - Cement Squeeze
1985-12-09 Perforation Treatment Performed - Jet Perforation
1989-10-31 Well Fluid changed to Crude Oil
1989-10-31 Well Mode changed to Suspended
1997-04-12 Well Fluid changed to Crude Oil
1997-04-12 Well Mode changed to Flowing
2008-11-01 Well Fluid changed to Crude Oil
2008-11-01 Well Mode changed to Suspended
2008-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-25 Plug Back Performed
2008-11-25 Well Fluid changed to Crude Oil
2008-11-25 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-12-18 Perforation 1144.80 1146.40 7
1985-12-09 Perforation 1141.70 1144.20 13
2008-11-25 Packing Device Capped w/Cement 1124.90 1132.90 0
1978-09-07 Packing Device Capped w/Cement 1128.50 1137.00 0
1978-09-08 Perforation 936.30 937.90 7
1984-03-28 Cement Squeeze 936.00 937.00 0
1984-03-29 Perforation 1144.80 1146.40 7
1984-03-30 Acid Treatment 1144.80 1146.40 0
1984-03-30 Cement Squeeze 1144.80 1146.40 0
1984-04-03 Perforation 1147.90 1148.50 13
1985-12-08 Cement Squeeze 1147.90 1148.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 300 0.0 0.0 0.0
1976 5743 0.0 0.0 0.0
1977 2928 0.0 0.0 0.0
1984 4565 0.0 0.0 0.0
1985 4860 0.0 0.0 0.0
1986 6914 0.0 0.0 0.0
1987 8082 0.0 0.0 0.0
1988 8231 0.0 0.0 0.0
1989 3431 0.0 0.0 0.0
1997 3588 0.0 0.0 0.0

For data sources see[5]

References