If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144260516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.147102,"lon":-113.509345,"icon":""}]} |
Location: 00/16-05-014-26W4/0 | |
Location Alias: 00/16-05-14-26 W4M | |
Location Alias 2: 00/16-05-014-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 26 | |
Section: 05 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: MOBIL PEACOCK 16-5-14-26 | |
Operator Name: ExxonMobil Canada Energy | |
License Number: 0210927 | |
License Date: 1997-12-19 | |
License Status: RecCertified | |
Spud Date: 1998-01-21 | |
Final Drill Date: 1998-02-03 | |
Well Total Depth: 2185.00 m | |
Surface Hole Latitude: 50.147102 | |
Surface Hole Longitude: -113.509345 |
Date | Event |
---|---|
1997-12-19 | Obtained License |
1998-01-24 | Surface Casing Operation Performed |
1998-01-28 | Drill Stem Test Performed |
1998-02-03 | Finished Drilling |
1998-02-03 | Well Log Performed |
1998-02-04 | Well Log Performed |
1998-02-05 | Drill Stem Test Performed |
1998-02-06 | Drill Stem Test Performed |
1998-02-07 | Drill Stem Test Performed |
1998-02-09 | Production Casing Operation Performed |
1998-02-09 | Rig Released |
1998-04-17 | Perforation Treatment Performed - Jet Perforation |
1998-04-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-04-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-04-20 | Plug Back Performed |
1998-04-21 | Perforation Treatment Performed - Jet Perforation |
1998-04-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-04-22 | Plug Back Performed |
1998-09-27 | Well Abandoned |
1998-09-27 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-04-17 | Perforation | 2136.00 | 2139.00 | 17 |
1998-04-18 | Acid Treatment | 2136.00 | 2139.00 | 0 |
1998-04-20 | Packing Device Capped w/Cement | 2126.00 | 2134.00 | 0 |
1998-04-21 | Perforation | 2044.00 | 2046.00 | 18 |
1998-04-22 | Packing Device Capped w/Cement | 2032.00 | 2040.00 | 0 |
For data sources see[4]