If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144262313020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.192078,"lon":-113.457705,"icon":""}]} |
Location: 02/13-23-014-26W4/0 | |
Location Alias: 02/13-23-14-26 W4M | |
Location Alias 2: 02/13-23-014-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 26 | |
Section: 23 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: RAMPART 102 PARKLDNE 13-23-14-26 | |
Operator Name: Rampart Oil Inc. | |
License Number: 0490193 | |
License Date: 2018-07-26 | |
License Status: Issued | |
Spud Date: 2018-08-18 | |
Final Drill Date: 2018-08-25 | |
Well Total Depth: 2044.00 m | |
Surface Hole Latitude: 50.192078 | |
Surface Hole Longitude: -113.457705 |
Date | Event |
---|---|
2018-07-26 | Obtained License |
2018-08-20 | Surface Casing Operation Performed |
2018-08-23 | Well Log Performed |
2018-08-25 | Finished Drilling |
2018-08-25 | Well Log Performed |
2018-08-25 | Well Mode changed to Drilled and Cased |
2018-08-27 | Production Casing Operation Performed |
2018-08-27 | Rig Released |
2018-08-27 | Well Log Performed |
2018-09-15 | Well Log Performed |
2018-09-16 | Perforation Treatment Performed - Jet Perforation |
2018-09-16 | Well Log Performed |
2018-10-05 | Well Began Production |
2018-10-05 | Well Fluid changed to Crude Oil |
2018-10-05 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-08-18 | Precision Drilling Corporation | 153 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-09-16 | Perforation | 2009.00 | 2016.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 2038 | 0.0 | 0.0 | 0.0 |
2019 | 8593 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-08-27 | No Incident Encountered | 0.00 | 0.00 |
2018-09-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]