If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144303610002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.219669,"lon":-113.965878,"icon":""}]} |
Location: 00/10-36-014-30W4/2 | |
Location Alias: 00/10-36-14-30 W4M | |
Location Alias 2: 00/10-36-014-30 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 30 | |
Section: 36 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: COMPTON APHRODITES 10-36-14-30 | |
Operator Name: Lexin Resources Ltd. | |
License Number: 0273228 | |
License Date: 2002-08-29 | |
License Status: RecCertified | |
Spud Date: 2002-09-16 | |
Final Drill Date: 2002-10-25 | |
Well Total Depth: 3402.00 m | |
Surface Hole Latitude: 50.219669 | |
Surface Hole Longitude: -113.965878 |
Date | Event |
---|---|
2002-08-29 | Obtained License |
2002-09-29 | Surface Casing Operation Performed |
2002-10-05 | Direction Drilling Operation Performed - Deviate |
2002-10-21 | Well Log Performed |
2002-10-25 | Finished Drilling |
2002-10-25 | Well Mode changed to Drilled and Cased |
2002-10-26 | Drill Stem Test Performed |
2002-10-26 | Well Log Performed |
2002-10-31 | Drill Stem Test Performed |
2002-11-01 | Drill Stem Test Performed |
2002-11-16 | Production Casing Operation Performed |
2002-11-16 | Rig Released |
2002-12-10 | Perforation Treatment Performed - Jet Perforation |
2002-12-10 | Well Log Performed |
2002-12-15 | Perforation Treatment Performed - Fractured |
2003-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-01-06 | Plug Back Performed |
2003-01-06 | Well Log Performed |
2003-01-08 | Perforation Treatment Performed - Jet Perforation |
2003-01-08 | Well Log Performed |
2003-03-11 | Perforation Treatment Performed - Fractured |
2003-03-18 | Perforation Treatment Performed - Jet Perforation |
2003-03-18 | Well Log Performed |
2003-03-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-04-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-04-01 | Plug Back Performed |
2003-04-01 | Well Mode changed to Abandoned Zone |
2003-05-31 | Perforation Treatment Performed - Jet Perforation |
2003-05-31 | Well Log Performed |
2003-06-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-06-01 | Perforation Treatment Performed - Cement Squeeze |
2003-06-02 | Perforation Treatment Performed - Jet Perforation |
2003-06-02 | Well Log Performed |
2003-06-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-06-04 | Perforation Treatment Performed - Cement Squeeze |
2003-06-04 | Perforation Treatment Performed - Jet Perforation |
2003-06-04 | Well Log Performed |
2003-06-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-06-05 | Perforation Treatment Performed - Cement Squeeze |
2003-06-05 | Perforation Treatment Performed - Jet Perforation |
2003-06-05 | Well Log Performed |
2003-06-13 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2002-10-05 | 2557.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-12-10 | Perforation | 3335.50 | 3337.00 | 17 |
2003-05-31 | Perforation | 1927.50 | 1929.50 | 17 |
2003-06-01 | Cement Squeeze | 1927.50 | 1929.50 | 0 |
2003-06-01 | Packing Device Capped w/Cement | 1899.50 | 1914.50 | 0 |
2003-06-02 | Perforation | 1849.00 | 1851.00 | 17 |
2003-06-04 | Perforation | 1833.00 | 1835.00 | 17 |
2003-06-04 | Cement Squeeze | 1833.00 | 1851.00 | 0 |
2003-06-04 | Packing Device Capped w/Cement | 1815.00 | 1823.00 | 0 |
2003-06-05 | Perforation | 615.00 | 617.00 | 17 |
2003-06-05 | Cement Squeeze | 615.00 | 617.00 | 0 |
2003-06-05 | Packing Device Capped w/Cement | 579.50 | 597.50 | 0 |
2002-12-15 | Fracture | 3335.50 | 3337.00 | 0 |
2003-01-06 | Packing Device Capped w/Cement | 3321.00 | 3329.00 | 0 |
2003-01-08 | Perforation | 3256.00 | 3257.50 | 17 |
2003-03-11 | Fracture | 3256.00 | 3257.50 | 0 |
2003-03-18 | Perforation | 3048.50 | 3051.50 | 20 |
2003-03-20 | Acid Treatment | 3048.50 | 3051.50 | 0 |
2003-04-01 | Packing Device Capped w/Cement | 3234.00 | 3242.00 | 0 |
2003-04-01 | Packing Device Capped w/Cement | 3032.00 | 3040.00 | 0 |
For data sources see[5]