X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0145043010002

Well Details

Well ID: 0145043010002
Loading map...
Location: 00/10-30-014-04W5/2
Location Alias: 00/10-30-14-04 W5M
Location Alias 2: 00/10-30-014-04 W5/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 5
Range: 04
Section: 30
County/Municipality: Kananaskis Improvement District
Well Name: Canlin SAVANCK 11-30-14-4
Operator Name: Canlin Energy Corporation
License Number: 0013224
License Date: 1957-03-21
License Status: Abandoned
Spud Date: 1957-04-29
Final Drill Date: 1958-04-12
Well Total Depth: 2863.60 m
Surface Hole Latitude: 50.202500
Surface Hole Longitude: -114.539582

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-03-21 Obtained License
1957-04-29 Direction Drilling Operation Performed - 98
1958-04-12 Finished Drilling
1958-04-14 Production Casing Operation Performed
1958-04-18 Perforation Treatment Performed - Jet Perforation
1958-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-02 Perforation Treatment Performed - Cement Squeeze
1958-05-02 Perforation Treatment Performed - Jet Perforation
1958-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-11 Perforation Treatment Performed - Cement Squeeze
1958-05-12 Perforation Treatment Performed - Jet Perforation
1958-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-19 Perforation Treatment Performed - Cement Squeeze
1958-05-19 Perforation Treatment Performed - Jet Perforation
1958-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-05-22 Perforation Treatment Performed - Cement Squeeze
1958-05-23 Perforation Treatment Performed - Jet Perforation
1958-05-24 Perforation Treatment Performed - Jet Perforation
1958-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-07-13 Perforation Treatment Performed - Bullet Perforation
1958-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-07-25 Well Mode changed to Drilled and Cased
1962-01-29 Well Began Production
1962-01-29 Well Fluid changed to Gas
1962-01-29 Well Mode changed to Flowing
1971-09-28 Well Fluid changed to Gas
1971-09-28 Well Mode changed to Suspended
1985-09-17 Perforation Treatment Performed - Bridge Plug No Cement Required
1985-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-09-21 Plug Back Performed
1985-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-09-22 Perforation Treatment Performed - Jet Perforation
1985-09-22 Plug Back Performed
2000-11-23 Well Abandoned
2000-11-23 Well Fluid changed to Gas
2000-11-23 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1957-04-29 1769.40 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-04-18 Perforation 2845.30 2848.40 13
1958-05-17 Acid Treatment 2795.60 2817.00 0
1958-05-19 Cement Squeeze 2795.60 2817.00 0
1958-05-19 Perforation 2757.50 2764.20 13
1958-05-21 Acid Treatment 2757.50 2764.20 0
1958-05-22 Cement Squeeze 2757.50 2764.20 0
1958-05-23 Perforation 2662.40 2670.70 13
1958-05-23 Perforation 2651.80 2657.90 13
1958-05-23 Perforation 2623.10 2642.60 13
1958-05-23 Perforation 2609.10 2621.30 13
1958-05-24 Perforation 2548.70 2600.90 13
1958-04-18 Perforation 2844.10 2845.00 13
1958-05-24 Perforation 2542.30 2544.20 13
1958-05-24 Perforation 2533.20 2538.70 13
1958-05-24 Perforation 2526.20 2532.00 13
1958-05-24 Perforation 2517.00 2521.90 13
1958-05-24 Perforation 2513.40 2516.10 13
1958-05-24 Perforation 2510.30 2512.80 13
1958-05-24 Perforation 2505.20 2508.20 13
1958-05-24 Perforation 2493.30 2504.20 13
1958-05-24 Perforation 2478.30 2480.50 13
1958-05-24 Perforation 2439.60 2461.60 13
1958-04-24 Acid Treatment 2844.10 2848.40 0
1958-05-24 Perforation 2443.30 2450.30 13
1958-05-24 Perforation 2435.40 2441.40 13
1958-05-24 Perforation 2412.80 2414.60 13
1958-05-24 Perforation 2391.20 2393.30 13
1958-05-24 Perforation 2378.70 2383.50 13
1958-05-24 Perforation 2346.00 2349.10 13
1958-06-03 Acid Treatment 2346.00 2670.70 0
1958-06-22 Acid Treatment 2346.00 2670.70 0
1958-06-24 Acid Treatment 2346.00 2670.70 0
1958-07-01 Acid Treatment 2346.00 2670.70 0
1958-05-02 Cement Squeeze 2844.10 2848.40 0
1958-07-13 Bullet Perforation 2583.20 2583.80 13
1958-07-16 Acid Treatment 2346.00 2670.70 0
1985-09-17 Bridge Plug, No Cement 2320.00 2320.00 0
1985-09-21 Packing Device Capped w/Cement 2262.00 2270.00 0
1985-09-22 Perforation 1645.00 1646.00 4
1985-09-22 Packing Device Capped w/Cement 1635.00 1643.00 0
1958-05-02 Perforation 2820.60 2837.70 13
1958-05-05 Acid Treatment 2820.60 2837.70 0
1958-05-11 Cement Squeeze 2820.60 2837.70 0
1958-05-12 Perforation 2795.60 2817.00 13
1958-05-16 Acid Treatment 2795.60 2817.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 1632 0.0 0.0 0.0
1970 960 0.0 0.0 0.0
1974 408 0.0 0.0 0.0
1977 120 0.0 0.0 0.0

For data sources see[6]

References